Laserfiche WebLink
L <br />u <br />SECTION 3 <br />(02/01) <br />3-1.01 GENERAL. --The bidder's attention is directed to the provisions in <br />Section 3, "Award and Execution of Contract," of the Standard Specifications and these <br />special provisions for the requirements and conditions concerning award and execution <br />of contract. <br />3-1.02 AWARD OF CONTRACT. --The award of contract, if awarded, will <br />t . be to the lowest responsible bidder whose proposal complies with all the requirements <br />prescribed. In the extent that two or more bids are the same and the lowest, the <br />County shall award the contract in accordance with the best intended effort of the <br />bidder to employ local residents as indicated on the Bidder Local Hire Information <br />Form. <br />3-1.02A LOCAL HIRE INFORMATION.--AII bidders are encouraged to <br />submit the "Bidder Local Hire Information Form" with their bid proposal. <br />3-1.03 CONTRACT BONDS. --In lieu of the provisions in Section 3-1.02, <br />"Contract Bonds," of the Standard Specifications, the following provisions shalt apply: <br />3-1.03A SURETY BONDS. --A surety bond of one hundred percent <br />(100%) of the contract price will be required of the successful bidder to <br />guarantee the faithful performance of said contract, and also required <br />shall be a separate "Labor and Materials" surety bond of one hundred <br />percent requirements of Section 3247-3252, inclusive of the Civil Code of <br />the State of California. <br />Iii <br />u <br />C! <br />0 <br />11 <br />3-1 <br />(SPECS119971C01N0N89-3-1 A) (10/9/03) <br />0 <br />