Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />H. All electrical items and controls <br />1. Vaults <br />J. Monitoring and control assemblies <br />K. Blowers <br />L. Air compressor <br />M. Air dryer <br />N. Condensate pump <br />O. Filters <br />P. LFG flow element <br />Q. Blower skid equipment and equipment layout. The Engineer will require 15 <br />working days to review this submittal. <br />R. Light fixtures <br />S. Other items as specified elsewhere <br />2.02 EQUIPMENT <br />A. The Contractor shall submit to the Engineer a list of the construction equipment to <br />be used on the project prior to start of work. <br />PART 3 EXECUTION <br />3.01 SUBMITTALS <br />A. Submittals shall be accompanied by a list of submittals, showing: <br />Submittal No. <br />Submittal Title <br />Date <br />North County LPG Collection System <br />San Joaquin County Public Works <br />6 <br />SUBMrrrALS <br />Section 01300 <br />