My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2006_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:26 PM
Creation date
7/3/2020 11:01:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_2
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2006_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />L <br />0 <br />0 <br />u <br />L <br />C <br />C <br />r - <br />h <br />H. No pipe installation will be accepted unless and until it meets the pressure <br />test requirements. <br />I. Costs associated with the testing of the pipe shall be included in the bid <br />price. No separate payment will be made. <br />J. The following items shall be removed from the pipe, or isolated from the <br />pressure during the pressure test: <br />1. Flex Hoses <br />2. Controls, instruments or equipment that would be damaged as a <br />result of the pressure test. <br />K. The Engineer or his designated representative shall witness all pressure <br />testing and repair work that may be required. The Contractor shall give <br />two business days notice prior to testing. <br />3.02 TESTING PE PIPE WELDS <br />A. One PE joint may be selected daily at random by the Engineer and cut <br />from the piping to test its integrity. The Contractor shall cut the weld from <br />the pipe as directed by the Engineer and reweld the pipe. <br />B. Testing shall be performed according to Plexco's "Qualification <br />Procedures for PE 3408 Extra High Molecular Weight High Density <br />Polyethylene" Bulletin No. 105Y or 106. Testing shall be performed by <br />the Contractor. <br />C. If the joint fails to pass inspection, the Contractor shall reweld and retest <br />the joint until the weld passes. A minimum of 10 percent of the <br />previously welded joints done during that day will be randomly cut from <br />the pipe and inspected and tested. If these joints pass inspection and <br />testing, then welding can proceed. The Contractor shall reweld and retest <br />the joint until the weld passes. <br />D. If any of the 10 percent fail, The Contractor shall remove all weld joints <br />made during that day from the pipe and reweld them. These welds are also <br />subject to the above procedure. <br />E. No additional time or payment shall be given to the Contractor for weld <br />tests and weld replacement. <br />North County LFG Collection System 3 CONTROL OF MATERIAL <br />San Joaquin County Public Works Section 01412 <br />
The URL can be used to link to this page
Your browser does not support the video tag.