Laserfiche WebLink
FIG TWO BOLLARDS PER LFG MIGRATION <br />q MONITORING WELL (NOT SHOWN), <br />LOCATED BY ENGINEER <br />1 1" APPROX <br />0 <br />1 12" <br />+ <br />WELL ENCLOSURE: PAINT RED AND <br />LABEL PER SPECIFICATIONS <br />PROBE PIPE <br />PROTECT WHILE PLACING CONCRETE <br />- INSCRIBE WELL NUMBER AND DATE <br />IN WET CONCRETE <br />z- CLASS 2 AB <br />NOTES: <br />1 CONSTRUCT WELL TO THE TOP OF BENTONITE PLUG IN <br />PRESENCE OF EHD INSPECTOR. <br />2 HYDRATE BENTONITE W/ 1 GAL WATER MINIMUM 1 HOUR <br />BEFORE PLACING CONCRETE <br />CONCRETE EXISTING GROUND <br />SURFACE <br />3x3x3 DOBIE (EACH SIDE) <br />PROBE PIPE <br />GRANULAR BENTONITE SEE NOTE 2 <br />POWDERED BENTONITE <br />PEA GRAVEL <br />PERFORATIONSFIG <br />P3 i <br />PROBE PIPE TIP AT BOTTOM <br />OF ROCK SECTION (TYP) <br />COUNTY OF SAN JOAQUINI REPLACEMENT SHALLOW I SECTION I FIG 2 <br />PROBE WELL <br />