Laserfiche WebLink
C. Abandoned borings <br />Abandoned Borings will be backfilled with neat cement in the presence of EHD. <br />3.04 AS -BUILT REPORT <br />After completion of the project, a final as -built well drawings and well location map will be <br />submitted to EHD. <br />3.05 PROJECT PERSONNEL <br />Following staff representatives will be on site to answer technical questions: <br />Design Engineer: <br />Inspection Contractor: <br />Joyesh Chandra <br />Vector Engineering. <br />Additional inspection: by Solid Waste Division staff as needed <br />Work Plan <br />SG -16 Shallow Replacement Wells San Joaquin County <br />North County Sanitary Landfill Page 3 of 5 Public Works Department <br />Solid Waste Division <br />