My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:13:27 PM
Creation date
7/3/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Thursday, May 13, 2010 2:03 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Robert McClellon [EH]; Michael Carroll; Marcus Davenport; Jaime Perez <br />Subject: Well installation project At Harney Lane & North County Landfill <br />Hello Natalia <br />We would like to confirm the work schedule for our planned well installation project at Harney Lane and <br />North County Landfill. The project schedule as mentioned before will be from May24th to June 8th_, <br />2010. This schedule includes groundwater (GW) well installation work at both sites and the installation <br />of two new shallow LFG migration monitoring wells at North County. <br />We have tentatively planned to start work at Harney lane first. Due to the nature of drilling work, well <br />installation inspection times scheduled with your department are tentative. We anticipate our drilling <br />contractor will be ready for the first well inspection around 2 pm on May 25th. We will call and confirm <br />the first inspection date and time after 12.00 pm on May 24th. It is our understanding that your <br />department is available for inspection from 9.00am to 3.30pm. Consecutive inspections needed for the <br />project will be scheduled with your department on site after the first inspection. <br />Our consultant, Vector Engineering, will also be on-site to log the wells as they are installed. If you <br />need any additional information, please call me at the phone number below. <br />Thanks <br />30YESH CHANDRA <br />SAN 30AQUIN COUNTY <br />PUBLIC WORKS DEPARTMENT <br />SOLID WASTE DIVISION <br />1810 E. HAZELTON AVE <br />STOCKTON, CA 95201 <br />PH: (209) 468-3066 <br />FAX: (209) 468-3078 <br />Email: ichandra@sjgov.org <br />5/13/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.