Laserfiche WebLink
Page 1 of 1 <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Thursday, May 13, 2010 2:03 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Robert McClellon [EH]; Michael Carroll; Marcus Davenport; Jaime Perez <br />Subject: Well installation project At Harney Lane & North County Landfill <br />Hello Natalia <br />We would like to confirm the work schedule for our planned well installation project at Harney Lane and <br />North County Landfill. The project schedule as mentioned before will be from May24th to June 8th_, <br />2010. This schedule includes groundwater (GW) well installation work at both sites and the installation <br />of two new shallow LFG migration monitoring wells at North County. <br />We have tentatively planned to start work at Harney lane first. Due to the nature of drilling work, well <br />installation inspection times scheduled with your department are tentative. We anticipate our drilling <br />contractor will be ready for the first well inspection around 2 pm on May 25th. We will call and confirm <br />the first inspection date and time after 12.00 pm on May 24th. It is our understanding that your <br />department is available for inspection from 9.00am to 3.30pm. Consecutive inspections needed for the <br />project will be scheduled with your department on site after the first inspection. <br />Our consultant, Vector Engineering, will also be on-site to log the wells as they are installed. If you <br />need any additional information, please call me at the phone number below. <br />Thanks <br />30YESH CHANDRA <br />SAN 30AQUIN COUNTY <br />PUBLIC WORKS DEPARTMENT <br />SOLID WASTE DIVISION <br />1810 E. HAZELTON AVE <br />STOCKTON, CA 95201 <br />PH: (209) 468-3066 <br />FAX: (209) 468-3078 <br />Email: ichandra@sjgov.org <br />5/13/2010 <br />