Laserfiche WebLink
0 <br />-2- <br />7. Module 4, SE Corner - Initial lift of waste in winter <br />pad. Wood waste processing area in background. <br />View to SE. <br />9. Storm water -- Temporary pond in future Module 5 <br />area. View to south. <br />11. Storm water -- Interim Sedimentation Basin (ISB) <br />— Dry at start of winter. View to SW. <br />0 <br />8. Module 4 — New interim cover over filled area. <br />View to W -SW. <br />10. Storm water -- Approximate location of <br />monitoring point SW -4 near Module 1. View to W- <br />NW. NW. <br />12. Storm water -- ISB outfall to ditch along eastern <br />perimeter of landfill. View to south. <br />