My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:13:27 PM
Creation date
7/3/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Todd Del Fr to -2- <br />REVISED NTATIVE SCA LE FOR UPGRADE OF MODULES 1 AN LEACHATE PUMPS <br />NORTH COUNTY RECYCLING CENTER AND SANITARY LANDFILL <br />Date <br />Activity <br />Note <br />Meet on site with pump installation contractor <br />Done — electrical service is <br />June 30, 2010 <br />to evaluate existing electrical service, options <br />sufficient. Pumps will be <br />for pumps <br />identical to each other, 7.5 HP <br />Done — National Pump Co. <br />July 31, 2010 <br />Identify pump make and model <br />Betaflow SP -1015 <br />(or equivalent) <br />Sept. 30, 2010 <br />Complete control panels' Process and <br />Done <br />Instrumentation diagrams <br />Jan. 15, 2011 <br />Complete mechanical design <br />90% done as of Nov 15, 2010 <br />Feb. 1, 2011 <br />Meet with on-call contractor to kick-off the <br />project <br />Review shop drawings from contractor and <br />Mar. 1, 2011 <br />subcontractors, as needed <br />April 1, 2011 <br />Receive final design from contractors, <br />approve assembly <br />June 1, 2011 <br />Assembly of panels complete <br />July 1, 2011 <br />Trenching for electrical conduit and pipes <br />Aug. 1, 2011 <br />Install panels and pump <br />Aug. 1, 2011 <br />Complete piping for new pumps <br />Sept. 1, 2011 <br />Construction complete <br />Jan. 29, 2012 <br />Due date per WDR <br />
The URL can be used to link to this page
Your browser does not support the video tag.