My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:13:27 PM
Creation date
7/3/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 <br />BACKGROUND .................................................................................................... <br />1 <br />1.1 <br />PURPOSE ...................................................................................................................... <br />1 <br />1 <br />1.2 <br />SITE DESCRIPTION ...................................................................................................... <br />1.3 <br />REASON FOR INSTALLING POLYETHYLENE (PE) TUBES INSIDE OF PVC PIPES.. 2 <br />1.4 <br />WELL LOCATION ........................................................................................................... <br />2 <br />2.0 <br />WORK TASKS ...................................................................................................... <br />2 <br />3.0 <br />......................................................................... <br />CONSTRUCTION........................ <br />3 <br />3.1 <br />SCHEDULE .................................................................................................................... <br />3 <br />4.0 <br />HEALTH AND SAFETY PLAN .............................................................................. <br />3 <br />4.1 <br />RESPONSIBILITY FOR SAFETY ................................................................................... <br />3 <br />4.2 <br />WORK SITE SAFETY ..................................................................................................... <br />3 <br />4.3 <br />SAFETY PROCEDURES ................................................................................................ <br />3 <br />Figure 1: Soil Gas Monitoring Well —Sampling Tube Design <br />Figure 2: Migration Monitoring Tube Lengths (Ft) <br />Figure 3: Soil Gas Monitoring Well —Picture of Assembled Sampling Port <br />Figure 4: Soil Gas Monitoring Well —Foothill Sanitary Landfill <br />Figure 5: Soil Gas Monitoring Well —North County Recycling Center and Sanitary Landfill <br />Figure 6: Soil Gas Monitoring Well —Harney Lane Sanitary Landfill <br />Figure 7: Soil Gas Monitoring Well —Corral Hollow Sanitary Landfill <br />Figure 8: Work Schedule <br />Work Plan —GW Monit Well Installation Project San Joaquin County <br />March 28, 2012 i Public Works Department <br />Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.