My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:13:27 PM
Creation date
7/3/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2010-2013
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
533
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />r <br />i <br />I <br />0 <br />11 <br />[7 <br />1 3.01 <br />LI <br />L <br />0 <br />H. Uncompleted Borings <br />1. If there is an interruption in work, such as overnight shutdown or inclement <br />weather, the Contractor shall: <br />a Measure and record depth of uncompleted borings left overnight. <br />b Cover the well opening a watertight uncontaminated cover with the <br />following methods: <br />c Leave the hollow stem auger in the boring and place the drills drive shaft <br />over it. <br />d Cover the boring with a 3/ -inch thick 4x8 plywood or a steel plate 2ft x 2ft in <br />size. Contractor shall place bentonite around plywood or steel covers if <br />used. The plywood or steel cover shall be secured in place or weighted <br />down so that it cannot be tampered or blown away by the wind. <br />e Direct all surface runoff away from the boring. <br />f Cordon -off the work area with safety cones and caution tape to the <br />satisfaction of the Engineer. <br />2. Contractor shall verify the depth of the well the next day by measuring with <br />the weighted tape. If the boring has collapsed, then the Contractor shall re - <br />drill the boring at no additional cost to the County. <br />I_1:1_1011 Biel Z c �7 ZI�Cc <br />If an obstruction or other condition is encountered that prevents the drilling <br />of a well at the location identified, the Engineer may request that the <br />Contractor abandon the boring. If directed so, the Contractor shall fill the <br />hole with neat cement. Neat cement backfill shall be in the presence of <br />EHD inspector. <br />WELL INSTALLATION <br />A. Well installation shall be in the presence of EHD inspectors. Contractor shall <br />follow the guidelines for well inspection as specified herein. <br />B. The Contractor shall measure the total depth of the borehole using a weighted <br />sounding line or other method as agreed with the Engineer and EHD inspector. If <br />heaving or cave-ins have taken place, then the Contractor shall clean out or <br />re -drill the borehole before well installation. <br />C. The Contractor shall ask for inspection by the Engineer of the casing, screen, and <br />any other well construction materials prior to installation. <br />San Joaquin County <br />Groundwater Monitoring Well Specifications 6 Public Works Dept <br />Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.