Laserfiche WebLink
Page 1 of 1 <br />Imam rm-n-m- n-numnm <br />From: Jaime Perez Operez@sjgov.org] <br />Sent: Friday, July 12, 2013 2:01 PM <br />To: Robert McClellon [EH]; Natalia Subbotnikova [EH] <br />Cc: Desi Reno; Michael Carroll; Steven Carter; David Gorton; Marcus Davenport; Billy Baier <br />Subject: NCRC&SL - REPAIRS TO GREEN/WOOD WASTE PROCESSING AREA <br />Thank you • . time to meet with Marcus and I this a.m. at the <br />NCRC&SL. As discussed, our game plan to repair the asphalt at the green/wood waste <br />processing area is as follows: <br />1. Move the rubble north of the green/wood waste processing area by September <br />2. Grade the noted area and start moving green waste to that area by September <br />a <br />3. Begin •the necessary repairstothe asphaltbyOctober <br />,P,. Complete the necessary repairs to the asphalt by or before November 29th. <br />.:n the interim, we will fill any visible low spots with temporary fill material to preven! <br />• • •I 10 . • • • • •' •': •:• •.. <br />THE BEST WAY TO GET STARTED IS TO STOP TALKING AND START DOING - WALN <br />DISNEY <br />Jaime L. Perez <br />• •:WasteOperations Manager <br />CountyofSanJoaquin <br />' • • • • t: • <br />P.O. <br />Box 0 <br />Stockton, • '. <br />20110-4114U i. <br />7/12/2013 <br />