Laserfiche WebLink
San Joaquin County PW—Solid Waste Responses to Comments <br /> FROM FWW, NO. Nov. e9 2006 05:42Pi9 P4 <br /> 14, The DEIR on page 2-10 considers titter control.The site,with the increase in elevation, <br /> will be subject to wind more often and of greater severity.Due to the higher elevation the 3-10 <br /> litter will be carried further off-site.Does the facility have access agreements with all the <br /> surrounding property owners to remove the wind blown titter. I€so,how far? <br /> 1 I. The DEIR on page 3.5-9 considers structural damage or injury from slope failure. The <br /> DEIR references a limited seismic slope-stability study conducted by Shaw <br /> Environmental,Inc.The study indicates,«the potential for permanent displacement of 311 <br /> the landfill slopes,during the MPE ground motions,sloes not exist."The study goes on to <br /> explain, <br /> It should be noted that the conceptual slope stability analyses performed address only the <br /> global slope stability of the loniPll,The stability of ituorim waste slopes within tine future <br /> modules should be addressed during the engineering designfor the vertle4l expansion. <br /> er r the seismic-analysis should be based on at updated seismle hazard report. <br /> a, Why wasn't the detailed seismic report that is recommended by this limited slope <br /> stability study completed as part ofthe overall analysis of the DEIR? <br /> b. The facility re-introduces leachate backinto the waste mass.Wiry was this <br /> additional load of moisture included is the slope stability analysis? <br /> 12. The proposed changes include the change In final elevation from 19S ft.above MSL to <br /> 424 ft.above M$L.The DEIR needs to diseuss the onsite roads and traffic.The elevation <br /> difference of 225 ff.will require that the roads be designed to facilitate vehicle traffic all 3-12 <br /> year around.The roads must be designed to allow access to all types of vehicles that are <br /> planned to access the working face.The drainage and erosion system should be designed <br /> in concert with the planned site roads., <br /> The EUD has reviewed the DTIR and cannot support the project as proposed at this time.' <br /> If you have any questions regarding this manor,you may contact me at(209)468-4332. <br /> Robert McClellon,Program Coordinator,REBS <br /> Environmental Health Department <br /> Cc:Keith Kennedy,California lrrtegrated Waste Management Board MS 15 <br /> Todd Del Prate,California Regional Water Quality Control Board <br /> Michael Carrcil,San Joaquin County Public Works Department <br /> Page 3 of 3 <br /> Final Environmental Impact Report November 22 2006 <br /> NCRC&SL Permit Revision 2.17 <br /> J&S 06307.06 <br />