My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
1831
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 11:02:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
614
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2010-0016 -11- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />NORTH COUNTY LANDFILL <br />SAN JOAQUIN COUNTY <br />45. Module 1's LCRS included perforated HDPE collection pipe (3 -inch laterals and 6 - <br />inch headers) in gravel -filled troughs overlying the blanket layer of filter <br />fabric/geonet. The foundation layer was graded at a 1.4% cross slope toward a <br />leachate collection sump on the western side of the module. The system was <br />plumbed for gravity drainage to the sump, which was constructed with a single <br />composite liner. The sump was installed with a manually operated pump and no <br />automatic flow recordation. The sump was plumbed to a 3,000 gallon above <br />ground storage tank (AGT) in the southwest corner of the module. <br />To ensure compliance with Discharge Specification B.5, Facility Specification CA <br />requires that all manually operated LCRS sumps, including Module 1's, be <br />upgraded to the automatic controls specified for new modules in Construction <br />Specification D.2.d. Provision G.8.a requires that the Discharger submit a work <br />plan and schedule for implementing these upgrades. <br />46. The interface between Modules 1 and 3 consisted of an anchor trench/berm <br />approximately 3 feet in height. <br />Module 3 <br />47. Module 3 was constructed in 1995 with a Subtitle D -compliant, engineered <br />alternative design (EAD) to the Title 27 prescriptive standard for an MSW landfill, <br />approved under previous WDRs (Order No. 95-068), as follows, from top to <br />bottom: <br />1. 10 oz/yd2 non -woven fabric. <br />2. HDPE single -side textured, placed smooth side up. <br />Module 3's LCRS was the same basic design as Module 4's (See Construction <br />Specification D.2), but with a manually operated sump pump. Also, the collection <br />sump for Module 3 was plumbed to the same AGT as Module 1. As with Module 1, <br />Facility Specification CA requires that Module 3 sump be upgraded to the <br />automatic controls specified for new modules in Construction Specification D.2.d, <br />while Provision G.8.a requires submission of a work plan and schedule for <br />implementing the required upgrade. <br />
The URL can be used to link to this page
Your browser does not support the video tag.