My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
1831
>
PR0440058
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:37 PM
Creation date
7/3/2020 11:02:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440058_17720 E HARNEY_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
614
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2010-0016 <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />NORTH COUNTY LANDFILL <br />SAN JOAQUIN COUNTY <br />LCRS ' %-foot gravel drain layer <br />Base Liner 60 -mil HDPE3 <br />GCL4 <br />Foundation Layer >_ 1' compacted subgrade >_ 1/2' <br />-26- <br />1. 8 oz/yd2 non -woven fabric. <br />2. Consists of geonet with overlying and underlying filter fabric. <br />3. Textured on both sides. <br />4. Shall exhibit appropriate strength characteristics (hydrated) to accommodate <br />stresses associated with specific landfill design parameters, with particular attention <br />to interface, long-term creep, shear, and bearing capacity. <br />2. Lateral expansions of the existing Unit (i.e., new modules) shall be constructed <br />in accordance with the following LCRS design: <br />a. Foundation layer - graded at 2.2% cross slope toward collection sump. <br />b. Blanket layer — <br />1) > 3/4 -foot thick layer of rounded gravel over base liner <br />2) Geocomposite (or equivalent combination of geonet and filter fabric) <br />over slide slopes. <br />c. French drain — perforated HDPE pipes installed in gravel filled troughs <br />above the base liner, including the following: <br />1) 4 -inch diameter laterals installed at 1 % minimum slope. Laterals shall <br />be equipped pipe risers at each end for inspection and cleaning, if <br />necessary, and a wire rope to enable video camera inspection of the <br />lines. <br />2) 6 -inch diameter header pipe at a minimum 2% slope. <br />d. Collection Sump — The collection sump shall be constructed as follows, <br />n <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.