Laserfiche WebLink
3.3.7 Operations and Maintenance for LFG Emission Monitoring and Control <br />System....................................................................................................................3-5 <br />3.3.8 Groundwater Monitoring..........................................................................................3-5 <br />3.3.9 Leachate Monitoring and Control............................................................................3-6 <br />3.4 Postclosure Maintenance Cost Estimates............................................................................ 3-6 <br />3.5 Financial Responsibility for Closure and Postclosure...........................................................3-6 <br />4.0 References.....................................................................................................................................4-1 <br />List of Figures <br />Figure 1 Vicinity Map <br />Figure 2 Surrounding Lands Topographic Map <br />Figure 3 Site Plan <br />Figure 4 Site and Land Use Map <br />Figure 5 Structures in Landfill Vicinity <br />List of Tables <br />Table 1 North County Recycling Center and Sanitary Landfill Vertical Expansion Volumetrics <br />Table 2 Preliminary Closure Cost Estimate <br />Table 3 Preliminary Postclosure Maintenance Cost Estimate <br />List of Drawings <br />-- Cover Sheet <br />Drawing 1 Final Grading and Drainage Plan <br />Drawing 2 Excavation Plan <br />Drawing 3 Cross Sections and Details <br />Drawing 4 Liner System Details <br />PCMP for NCRCSL ii <br />0:ISan Joaquin CountylNCRCSL1118040PCPMPIFinal Reporf PCPMP-Reyjan_2010.Doc <br />Department of Public WorksiSolid Waste <br />County of San Joaquin - January 7, 2010 <br />