Laserfiche WebLink
u <br />C <br />Preliminary Closure Cost Estimate <br />Items I Quantity I Units I Unit Cost I Extn <br />CIMAI r`()\/GP INCTAI I ATION <br />Existing : Vegetative Partial Soil Cover <br />Proposed : Prescriptive Cover (for costing) <br />7 <br />EA <br />$2,500 <br />$17,500 <br />1.0 Preparation for cover placement <br />185 <br />ACRE <br />$3,500 <br />$647,500 <br />2.0 Place GCL Barrier <br />8,461,500 <br />SF <br />$0.60 <br />$5,076,900 <br />3.0 Place Geocomposite Drainage Layer <br />(over 20% of the geomembrane) <br />1,692,300 <br />1 SF <br />$0.60 <br />$1,015,400 <br />4.0 Place 1 foot Vegetative Soil Cover <br />470,000 <br />CY <br />$4 <br />$1,252,000 <br />5.0 Hydroseeding <br />185 <br />ACRE <br />$3,500 <br />$647,500 <br />Final Cover Soil Subtotal <br />$8,639,300 <br />I CAPUATC PAKITDOI IMPPOVFMFNTC <br />Existing : All facilities for 7 sumps in place at time of closure <br />7.0 Proposed : Inspect and repair all leachate removal systems <br />7 <br />EA <br />$2,500 <br />$17,500 <br />Leachate Control Improvements Subtotal <br />2 <br />LS <br />$10,500 <br />$17,500 <br />I Ir. MIMPATION MONITORINr; ANn CONTROL SYSTEM <br />Existing: All facilities are in place at time of closure <br />8.0 Proposed: Replacements during closure <br />3 <br />Each <br />$10,500 <br />$31,500 <br />LFG EMISSION MONITORING AND CONTROL SYSTEM <br />2 <br />LS <br />$10,500 <br />$21,000 <br />Existing : Majority of system in place <br />$21,000 <br />9.1 Proposed: Disabling and Rebuilding Gas System* <br />1 <br />LS <br />$60,300 <br />$60,300 <br />9.2 Proposed: Well Replacement Costs* <br />1 <br />LS <br />$121,700 <br />$121,700 <br />LFG Emission Control System Subtotal <br />i <br />1 <br />1 $213,500 <br />!_D011KIMMATGD MONITORINr: RYSTFM <br />Groundwater Monitoring installations <br />Existing: All facilities are in place at time of closure <br />10.0 Proposed: Wells replaced during closure <br />2 <br />LS <br />$10,500 <br />$21,000 <br />Groundwater Monitoring System Subtotal <br />$21,000 <br />* See supplemental LFG system cost estimates, Page D-5 <br />PCMP for NCRCSL D-1 <br />0ASan Joaquin CountytNCRCS01180401PCPMPIFinal ReporAPCPMP_Rev-Jan_2010.Doc <br />Department of Public Works/Solid Waste <br />County of San Joaquin - January 7, 2010 <br />