<br />SUMMARY OF BIDS OPENED April 01, 2009 at 2:30 P.M.
<br />Stanislaus County Fink Road Landfill
<br />Landfill 2, Cell No. 5, Construction Project
<br />Item No.
<br />1
<br />Item
<br />Mobilization and Demobiliza8on
<br />Tcichcrr
<br />Conmuctioa
<br />Raminha Con-.6on,loc.
<br />Whitaker Contractor Im,
<br />Si<m EquipmentRmtal. Inc
<br />Granite Construcdoo
<br />Co.
<br />Unit of
<br />Measure
<br />LS
<br />LS
<br />CY
<br />Estimated
<br />Quantity
<br />1
<br />1
<br />7,700
<br />1,327,300
<br />20,600
<br />785.500
<br />824,700
<br />Item Prlce
<br />(Figures)
<br />$441.000.00
<br />$100,000.00
<br />53.00
<br />Total
<br />(Figures)
<br />$441,000.00
<br />Item Price
<br />(Fgures)
<br />$400,000.00
<br />Total
<br />(Figures)
<br />$400.000.00
<br />Item Price
<br />(Fguras)
<br />5280,000.00
<br />Total
<br />(Fgures)
<br />$280,000.00
<br />Item Price
<br />gores)
<br />5220,000.00
<br />Total
<br />(Fyures)
<br />$220,000,0
<br />Item Price
<br />(Figures)
<br />$231,000.00
<br />Total
<br />(Fl9uresj
<br />2 Layout of Work and Surveys
<br />-S100.006.00
<br />55,100.00
<br />$40,000.00 540,000.00 522,000.00 $22,00000 $30,000.00 530,000.00 524,000.00
<br />$231,000.00
<br />$24,000.00
<br />3
<br />4
<br />4
<br />5-
<br />6
<br />7Gn¢syrdhe5c
<br />8
<br />Earihfili _-
<br />Excavation
<br />Low Penneab0iry SoA Layer
<br />Subgrade Preparation
<br />Clay Uner ---
<br />(S) 80 mil HDPE Geomembrane
<br />$5.00
<br />58,500.0
<br />$200
<br />53,400.0
<br />$1.00
<br />$1,700.0
<br />$4.00
<br />$6,800.00
<br />CY
<br />CY
<br />SF
<br />SF
<br />$1.15
<br />-�-^ $225
<br />$0.10
<br />$0.74
<br />$0.56
<br />$1,526,395.00
<br />546,350.00
<br />$78,550.00
<br />$610278.00
<br />$466,480.00
<br />$71,431.00
<br />$67,200.00
<br />--- 8350,800.00
<br />$6,375.00
<br />- 31.37
<br />$850
<br />50.02
<br />._$0.67
<br />$0.51
<br />-$() 65
<br />50:13
<br />$38.00
<br />5130.00
<br />$'1,818,401.00
<br />5175,100.00
<br />$15,710.00
<br />$552,549.00
<br />5424,830.00
<br />$10,495.0
<br />$62,400.1
<br />-S3332fi0.OD
<br />$11,050.00
<br />$1.62
<br />$3.40
<br />50.12
<br />$0.69
<br />SOS3
<br />50.66
<br />50.13
<br />-----i3-4 .00
<br />558.00
<br />52,150,226.00
<br />$70,040.00
<br />--$94,260,W
<br />5569,043,00
<br />$441,490.00
<br />$70,628.00
<br />582,400.00
<br />$298,16000
<br />$4,930.00
<br />$175
<br />5750
<br />50.2
<br />50.62
<br />50.48
<br />50.60
<br />$0.12
<br />$40.00
<br />$50.00
<br />52,322,775.00
<br />$154,500.00
<br />5796,375.00
<br />$511,31400
<br />$399,840.0
<br />59.660.00
<br />557.600.00
<br />5350,800.00
<br />$4250.0
<br />225
<br />-$2.25-
<br />5200
<br />5012--
<br />50.62
<br />$0.48
<br />50.60
<br />--
<br />$0.12
<br />$40.00 ---7$350
<br />$40.00
<br />52,986,425.00
<br />$61,200.00
<br />$94,260.00
<br />$511,314.00
<br />$399,840.00
<br />$9,660.00
<br />557,600.00
<br />8-00.00
<br />$3,400.00
<br />SF
<br />833,000
<br />9 (S) Geocomposlte Drainage Layer (S)
<br />10 (S)Gaotex6le Filter (S)
<br />I1 LCRS Drainage Gravel
<br />12 Sump Gravel
<br />_--
<br />SF
<br />SF
<br />CY
<br />CY
<br />16,100
<br />480,000
<br />8,770---��
<br />85
<br />-
<br />50.71
<br />-$0 14
<br />$40.00
<br />575.00
<br />-- - $2.90
<br />$7.50
<br />5225
<br />522.00
<br />$24.00
<br />13 Base OPeratlons layer
<br />140 .Side Slope Operatlons Layer Stockpiling
<br />_ 148 Side Slope OperaBons LayerPlacement
<br />15 64nch Diamter SDR 75.5 HPDE PIPs
<br />�� 16 8 -Inch 0)ameterSOR 17.5 HDPE Pipe
<br />17 12
<br />CY
<br />-EY-
<br />CY
<br />LF
<br />LF
<br />35,700
<br />23,600
<br />10,100
<br />1,670
<br />925
<br />5103,530.00
<br />535,400.00
<br />--- --j2-2
<br />536,740.00
<br />$22,200.00
<br />$7.50
<br />54.00
<br />510.00
<br />$13.00
<br />$20.00
<br />$267,750.00
<br />$94,400.00
<br />$107,000.00
<br />$21,710.00
<br />518.500.00
<br />-- $3.60
<br />50.80
<br />$320
<br />$16.00
<br />- $16.00
<br />318.880.00
<br />532,320.
<br />$26,720,
<br />$14,800.00
<br />-$3.25
<br />41.00
<br />_S4 00
<br />$25,00
<br />$40,00
<br />$116,025.0
<br />$:23,600.
<br />$40,400.00
<br />541,750.00
<br />$37,000.00
<br />$1.90
<br />51.00
<br />$225
<br />512.00
<br />$17.00
<br />$67,830.00
<br />$23,600.00
<br />$22.725.00
<br />$20,040.00
<br />$15,725.00
<br />78
<br />19
<br />-Inch Oiamter SDR 1S.5 HPDE Pipe
<br />78 -inch D'mmter SDR 15.5 HPDE Pipe
<br />244nch Diameter CMP
<br />LF
<br />LF
<br />350
<br />180
<br />$70.00
<br />$90.00
<br />--- 560.00
<br />$24,500.00
<br />516,200.00
<br />521,000.00
<br />$38.00
<br />$67.00
<br />- 546.00
<br />55,000.00
<br />' -5-8-00--$20,40(X-00
<br />$13,300.00
<br />$12,060.00
<br />516,100.0
<br />$5,000.00
<br />$4800
<br />584.00
<br />$8800
<br />54,000,00
<br />$5.50
<br />518,800.00
<br />$15,120.00
<br />$30,800,
<br />1 54,000.00
<br />514,0250
<br />$100.00
<br />$150.00
<br />$60.00
<br />-S5.000 00
<br />510.00
<br />335,000.00
<br />--$27,000.0
<br />521,000.00
<br />$5,000.00
<br />$25,500,00
<br />55200
<br />$90.00
<br />$80.00
<br />$2500.00
<br />$4.00
<br />$18200.00
<br />$16200.00
<br />$28,000.00
<br />32,500.00
<br />$10,200.00
<br />LF
<br />350
<br />20 afoot Diameter SDR 17.0 HDPE MaNtole
<br />21 Expose and Prepare Exiseng Geomembrane liner
<br />EA
<br />LF
<br />1
<br />2,550
<br />$6,500.00
<br />55.00
<br />$6,500.00
<br />$12,750.00
<br />22
<br />23
<br />24
<br />Petimater and Side Slope Andior Trenches
<br />(S) Underground Elechtc41 Conduit and Wiring
<br />aecbical
<br />LF
<br />LS
<br />3,350
<br />t
<br />315.00
<br />$69,000.00
<br />550,250.00
<br />$65,000.06
<br />$7.00
<br />220.000.00
<br />$23,450.00
<br />$24000.0
<br />5720
<br />$13.000.00
<br />$24,120.00
<br />$13.000-00
<br />- $15,00
<br />5125,000.00
<br />- $50,250.00
<br />3125,000.00
<br />$18.00
<br />565,000.00
<br />$60.300.00
<br />$65,000.00
<br />25
<br />26
<br />27
<br />28
<br />29
<br />30
<br />31
<br />32
<br />(S) Connections and Pumps
<br />Concrete Spill RevenBon Pads
<br />(S) Leak Location Survey
<br />RevegetatioNHydroseeding
<br />Silt Fenix; ---
<br />Class 2Roatl Base
<br />SeJectWe DemaBdon
<br />Ditch Exn ben
<br />RIP Rap
<br />LS
<br />EA
<br />FA
<br />AC
<br />lF
<br />CY
<br />-
<br />LS
<br />LF
<br />LS
<br />LS
<br />LS
<br />1
<br />1
<br />1
<br />68
<br />7,100.
<br />200
<br />1
<br />4,500
<br />1
<br />1
<br />1
<br />360000.00
<br />$2.000.00
<br />526,400.00
<br />$1,580.00
<br />5230
<br />$50.00
<br />55,000.00
<br />$4.00
<br />58,000.00
<br />$7,500.00
<br />57,500.00
<br />560,000.00
<br />526,600.00
<br />$102,000.0
<br />516,330.00
<br />$10,000.00
<br />$5,000.00
<br />518,000.00
<br />$8,000.00
<br />$7,500.00
<br />$7,500.00
<br />*-T2-0.000 00
<br />-$7,500-00
<br />516,500.00
<br />$1,25000
<br />52.00
<br />$40.00$8,000.00
<br />-S3,000 00
<br />-$2 00
<br />$3,500.00
<br />$8,500.00
<br />$5,500.00
<br />324000.00
<br />$7,500.00
<br />$76,500.00
<br />385,000.00
<br />$14,200.D0
<br />$3,000.00
<br />-S9,000 00
<br />$3,500.00
<br />$8,500.00
<br />$5.500.00
<br />$16.000.00
<br />$7,000.00
<br />$19,000.00
<br />51,410.00
<br />5220
<br />$54.00
<br />-S5
<br />.Wo 00
<br />3250
<br />55,000.00
<br />522,000.00
<br />$6,900.00
<br />$16,000.00$15,000.00
<br />$7000.00
<br />$19,000.00
<br />595,880.0
<br />$15,620.00
<br />$10,800.00
<br />$5,500.00
<br />$11,250.00
<br />$5,000.00
<br />5220D0.0
<br />56,900.
<br />$1,500.00
<br />$15,000.00
<br />$1,620.00
<br />$3.00
<br />350,00
<br />35,000.00
<br />$325
<br />$2,500.00
<br />55,000.00
<br />$15,00000
<br />515.000.00
<br />-$1.500.00$3,000.00
<br />$15,000.0 --VO,000.00
<br />$110,160.00
<br />$21,300.00
<br />310,000.00
<br />-$5,000 00
<br />$14,625.0
<br />$2,500.00
<br />$5,000.0
<br />$15,000.00
<br />$80,000.00
<br />$1200,00
<br />-$1 10
<br />W.()o
<br />$5,000.00
<br />$200
<br />$6,000.00
<br />$2,000.00
<br />57,000.00
<br />$60,000.00
<br />53,000.00
<br />320,000.00
<br />$81,600.00
<br />-$7.810 00
<br />58,000.00
<br />$5,000.00
<br />$9,000.00
<br />56,000.00
<br />$2000.00
<br />$7,000.00
<br />33 Skemn ter Pohu6onPrevention Plan
<br />34 Abandonment of ExLvllng Groundwater Monitoring
<br />Wells 10 and 11
<br />35
<br />Installallon of Groundwater Monitoring Wells 25 and
<br />LF
<br />130
<br />5100.00
<br />0000
<br />573.000.00��175.00
<br />$9,750.00
<br />58700
<br />$713100056500
<br />512000
<br />575,680.00
<br />36Transport
<br />o(Water
<br />1,0ni gal
<br />units
<br />13,500
<br />units
<br />$13,50000514.00
<br />$189,000.0
<br />$12.00
<br />$297,000.00
<br />$DSO
<br />$6,750.00
<br />$10.00
<br />$735,000.00
<br />34,415,98400
<br />54,845,385.00
<br />54,868,960.00
<br />$6,036,626.00
<br />55,426,629,00
<br />D: Ircd.copr\Ucal Scnings\Tcmpmnry kno,ect Fi1cs10LKA21Sumnmry ctv.xis