Laserfiche WebLink
r eb-� s-c�5 UL : 5c�r• P-07 <br />APR 2 3 1Q21 <br />t=PdY►R0NmE,NTAL NEALTir <br />PERMIIT/SEKrcc� <br />Tom Horton, Solid Waste Manager and Gabriel Karam, Senior Solid Waste <br />Engineer, can be contacted at (209) 468-3000 for emergencies and <br />hazardous waste inquiries. <br />Additional measures may be required upon the request of the LEA or the <br />Board. <br />!. Anticipated changes in design and operation in the next 5 years are: <br />A. The introduction of new recycling methods and programs. <br />J. <br />Operating Hours: <br />7:00 a.m. - 5:00 P.M. - Daily <br />Operations conducted during the hours of darkness require adequate <br />lighting as approved by the LEA. <br />The service life expectancy is 42 years. The estimated closure date is <br />2035. <br />2. The <br />following documents describe and condition the design and operation of <br />AMIL the facility. <br />dated June 1989. <br />A. <br />San Joaquin County Land Use Permit No. UP -89-2 , <br />B. <br />PG & E easement document dated December 1951. <br />C. <br />Regional Water Quality Control Boards's Waste Discharge Requirements - <br />Order 91-021 dated January, 1991. <br />D. <br />Final Environmental Impact Report dated March, 1989, SCH 88060714 <br />The Mitigated <br />and the Addendum to the Final EIR dated October, 1990. <br />Negative Decarlation dated October, 1992, SCH 92082082. <br />F. <br />Report of Disposal Site Information dated July, 1989, and Amendment <br />to the Report of Disposal Si[e Information dated October, 1990. <br />G. <br />U. S. Army Corps of Engineers Nationwide Permit #26 dated June 26, <br />1990. <br />H. <br />Report of Waste Discharge dated July, 1989. <br />I. <br />Wetlands Mitigation Plan dated May, 1990. <br />J. <br />Mitigation Monitoring Plans dated October, 1990 and October 27, 1992. <br />i� <br />