Permit Unit Requirements for N -1119-1-i continued) t Page 3 of
<br />16. This operating permit maybe cancelled with APCO approval when the landfill is closed, pursuant to the requirements
<br />this permit, if the landfill is not otherwise subject to the requirements of either 40 CFR part 70 or part 71 and if
<br />her 1) it was never subject to the requirement for a control system under 40 CFR 60.752(b)(2); or 2) the owner or
<br />operator meets the conditions for control system removal specified in 40 CFR 60.752(b)(2)(v). [40 CFR 60.752(d) and
<br />62.14352(f)] Federally Enforceable Through Title V Permit
<br />17. If the landfill is permanently closed, a closure notification shall be submitted to the APCO within 30 days of waste
<br />disposal cessation. A permanent closure must take place in accordance with 40 CFR 258.60. If a closure report has
<br />been submitted, no additional waste may be placed in the landfill without filing a notification of modification to the
<br />APCO, pursuant to 40 CFR 60.7(a)(4). [40 CFR 60.752(b)(1)(ii)(B), 60.757(d) and 62.14352(f)] Federally Enforceable
<br />Through Title V Permit
<br />18. If the calculated NMOC is equal to or greater than 50 megagrams/year, the owner or operator shall install a collection
<br />and control system, that effectively captures the gas generated within the landfill, within 30 months of that
<br />determination. This operating permit must be modified accordingly to show compliance with 40 CFR 62, Subpart
<br />GGG requirements applicable to a MSWL with a collection and control system. [40 CFR 60.752(b)(2)(ii), 60.753,
<br />60.755, 60.756, 62.14353 and 62.14354] Federally Enforceable Through Title V Permit
<br />19. If a gas collection and control system is installed, it shall comply with the operational standards of 40 CFR 60.753, the
<br />compliance provisions of 40 CFR 60.755, the monitoring provisions of 40 CFR 60.756, the reporting and record,
<br />keeping requirements of 40 CFR 60.757 and 60.758, and the requirements of 40 CFR 60.759. (for active collection
<br />systems). [40 CFR 60.752(b)(2)(11), 60.753, 60.755, 60..756, 60.757, 60.758, 60.759, 62.14353 and 62.14354(b)]
<br />Federally Enforceable Through Title V Permit
<br />20. Permittee shall comply with the Increments of Progress as defined in Table 3 of 40 CFR 62, Subpart GGG, unless a
<br />site specific schedule is approved by EPA, which includes notification, of EPA no later than 10 business days after
<br />completing each increment of progress. [40 CFR 62.14355(6)] Federally Enforceable Through Title V Permit
<br />1) 1 Adbrmittee shall submit the Final Control Plan (as defined in 40 CFR 62.14351) one year after the first annual emission
<br />We report showing NMOC emissions > 50 megagrams/year, unless a site-specific schedule is approved by EPA.
<br />(Increment 1) [40 CFR 62.14356(a)(1)] Federally Enforceable Through Title V Permit
<br />22. Permittee shall Award Contract(s) (as defined in 40 CFR 62.14351) on or before December 6, 2001, or 20 months after
<br />the first annual emission rate report showing NMOC emissions > 50 megagrams/year, unless a site-specific schedule is
<br />approved by EPA. (Increment 2) [40 CFR 62.14356(a)(2)] Federally Enforceable Through Title V Permit
<br />23. Permittee shall Initiate On -Site Construction (as defined in 40 CFR 62.14351) on or before April 6, 2002, or 24 months
<br />after the first annual emission rate report showing NMOC emissions > 50 megagrams/year, unless a site-specific
<br />schedule is approved by EPA. (Increment 3) [40 CFR 62.14356(a)(3)] Federally Enforceable Through Title V Permit
<br />24. Permittee shall Complete On -Site Construction (as defined in 40 CFR 62.14351) on or before October 6, 2002, or 30
<br />months after the first annual emission rate report showing NMOC emissions�> 50 megagrams/year, unless a site-
<br />specific schedule is approved by EPA. (Increment 4) [40 CFR 62.14356(a)(4)] Federally Enforceable Through Title V
<br />Permit
<br />25. Permittee shall Achieve Final Compliance (as defined in 40 CFR 62.14351) on or before October 6, 2002, or 30
<br />months after the first annual emission rate report showing NMOC emissions > 50 megagrams/year, unless a site-
<br />specific schedule is approved by EPA. (Increment 5) [40 CFR 62.14356(x)(5)] Federally Enforceable Through Title V
<br />Permit
<br />26. Permittee must conduct initial performance tests of the landfill gas collection system and air pollution control
<br />equipment on or before April 4, 2003, or 30 months and 180 days after the first annual emission rate report showing
<br />NMOC emissions > 50 megagrams/year, unless a site-specific schedule is approved by EPA. [40 CFR 62.14356(a)(5)]
<br />Federally Enforceable Through Title V Permit
<br />7 '7 equipment or systems installed or used to achieve compliance with the terms and conditions of this Permit to
<br />40erate shall be maintained in good working order and be operated as efficiently as possible to minimize air pollution
<br />emissions. [District NSR Rule] Federally Enforceable Through Title V Permit
<br />PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE
<br />These terms and conditions are part of the Facility -wide Pen -nit to Operate.
<br />acility Name: NORTH COUNTY SANITARY LANDFILL
<br />-N- 17049 C uADNI=V 1 AMM 1 ! nl ! A nQ
<br />
|