Laserfiche WebLink
C7 <br />v <br />necessary. A storm drainage detention basin will receive the majority of surface water runoff from <br />the landfill areas before discharge to the natural drainage channel. <br />Both the initial construction and final cover and any later repair work that involves the cover's low <br />hydraulic conductivity layer (if present) will be completed in accordance with an approved <br />construction quality assurance plan. <br />North County RC&SL <br />Joint Technical Document <br />Page 30 of 69 Public Works/Solid Waste <br />County of San Joaquin — February 10, 2010 <br />