1 <br />C� <br />939-03.10 <br />FOOTNOTES TO TABLE 5 <br />CLOSURE AND POSTCLOSURE COSTS <br />CORRAL HOLLOW SANITARY LANDFILL <br />1. All costs are in 1988 dollars. <br />2. Final cover and seeding is for Module 4 only. Final cover and <br />seeding for Modules 1, 2, and 3 is placed during landfill operatio <br />3. Foundation layer is two (2) feet deep; however, one (1) foot is <br />placed during landfill operations as intermediate cover. <br />4. Drainage facilities and earthfills may be placed during the <br />operational life of the landfill. <br />5. Closure Monitoring, Supervision and Report consists of supervision <br />by a registered civil engineer or a certified engineer geologist; <br />emplacement of any necessary monitoring wells or gas probes; <br />sampling and testing for baseline monitoring; and preparation of t <br />closure construction, and operations and maintenance report. <br />6. Tentative based on approval of the Ground -Water Monitoring Plan. <br />21 <br />Mon Associates <br />