My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1993_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 11:04:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1993_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES <br />Significance Criteria <br />According to CEQA, a project will normally have a significant adverse impact on air quality if it will "violate <br />any ambient air quality standard, contribute substantially to an existing or projected air quality violation, <br />or expose sensitive receptors to substantial pollutant concentrations." <br />The project's potential for violating the ambient air quality standards for local pollutants or causing <br />nuisance to neighboring properties is used in this EIR to determine the significance of localized air quality <br />impacts. <br />For regional pollutants, violation of air quality standards cannot be used as a "threshold of significance" <br />since the standards are exceeded in the San Joaquin County. The U. S. Environmental Protection Agency <br />has recently published a proposed rule regarding conformity determination for non -transportation projects <br />that includes annual emission thresholds for non -attainment areas and maintenance areas that trigger the <br />need for a conformity determination, and project impacts have been judged using these thresholds of <br />significance (U.S.E.P.A 1993). These significance thresholds are 54.7 pounds per day for ozone <br />precursors (ROG and NOx), 82 pounds per day for PM -10, and 219 pounds per day for SOx. <br />Impact <br />4.7-1 Construction activities such as clearing, excavation and grading operations, construction <br />vehicle traffic and wind blowing over exposed earth would generate exhaust emissions and <br />fugitive particulate matter emissions that would affect local and regional air quality. <br />Construction activities are a source of organic gas emissions. Solvents in adhesives, non- <br />waterbase paints, thinners, some insulating materials and caulking materials would evaporate into <br />the atmosphere and would participate in the photochemical reaction that creates urban ozone. <br />Asphalt used in paving is also a source of organic gases for a short time after its application. <br />Construction dust could affect local air quality at various times during construction of the project. <br />The dry, windy climate of the area during the summer months combined with the fine, silty soils <br />of the region create a high potential for dust generation when and if underlying soils are exposed <br />to the atmosphere. <br />The effects of construction activities would be increased dustfall and locally elevated levels of PM <br />10 downwind of construction activity. Construction dust has the potential for creating a nuisance <br />at nearby properties, although sensitive land uses nearby are limited to two residences located <br />about 600 feet north of the site on the east side of MacArthur Drive. Construction dust is <br />considered to represent a potentially significant localized and temporary impact. <br />Mitigation <br />4.7-1 The severity of construction impacts can be reduced to a level that is less -than -significant through <br />application of additional mitigation measures. To ensure that construction mitigation is utilized, <br />final approval should not be given until the contractor submits a satisfactory PM -10 Dust <br />Prevention and Control Plan. This plan should specify the methods of control that will be utilized, <br />demonstrate the availability of needed equipment and personnel, and identify a responsible <br />individual who, if needed, can authorize the generation and implementation of additional <br />measures, if needed. <br />The Plan should, at a minimum, include the following: <br />ER -93-1 -87- (9-27-93) <br />
The URL can be used to link to this page
Your browser does not support the video tag.