My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1993_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_1993_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 11:04:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1993_1
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_1993_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRACY MATERIALS RECOVERY & TRANSFER FACILITY DRAFT EIR, continued: <br />San Joaquin County Department of Public Works Comments <br />November 15, 1993 Page 2 <br />5. The discussion about future public transit service should be modified <br />to state that passenger rail service is targeted for implementation in <br />1996 on the Union Pacific tracks in the project area. While no stops <br />B 2 3 <br />are planned at the immediate project area, a station site is proposed at <br />the intersection of Corral Hollow and Linne Road. <br />6. Would the project related truck trips on the poor condition at-grade <br />railroad crossing create impacts of any significance? <br />B24 <br />FLOOD CONTROL DIVISION- <br />"Impact <br />1. 4.5-3" states thatJ ro'ect water use is'anticipated to be <br />P <br />much less than the water usage resulting from conventional agricultural <br />B25 <br />production at the site. What is the past and current water use of the <br />site? What is the anticipated water use of the proposed project? ; <br />2. "MitigationMeasure 4.5-6" the first sentence should be revised as <br />follows: <br />"The project proponent should construct' berms adequate to prevent <br />B 2 6 <br />a 100-year 24-flour flood in Corral Hollow Creek from accidentally <br />overflowing into the pit." <br />3. On Page 11itis :stated that the retention pond will be sized for <br />200'x® of the 10-year '24-hour storm. However, "Mitigation Measure 4.5-1" <br />B27 <br />states that the basin will be designed for a 100-year storm. The <br />`inconsistency should be addressed. <br />Dennis Corcoran, Jr. Engineer, 209 -3060 <br />DC:kah (11/03/93) <br />Should you need clarification or amplification, lease call me at 8-3073 or b <br />y P P y <br />direct response to the commenting division and person listed above. <br />KAH <br />C:\WGRD\ERYIROIS\RESPONSE\7NUTF.EIR <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.