Laserfiche WebLink
B2 <br />. .The information has been acknowledged. No further response is ,re_uire` <br />d. <br />B3 <br />The EIR has been revised to reflect the concerns of the Airport Land Use Commission. Language has <br />been added to Impact 4.4-4, as has amitigation measure. The Summary Table (Table 3.1) and the <br />Mitigated Project Alternative have also been revised to reflect this. <br />B4 <br />The information has been acknowledged. No further response is required. <br />B5 <br />The information has been acknowledge. No further response is required. <br />B6 <br />The EIR has been revised to reflect these suggestions. <br />B7, <br />The comment has been acknowledged. No further response is required. <br />B8 <br />The suggested mitigation measure has been added to Mitigation Measure 4.7-1. I <br />B9 <br />The EIR has been revised to reflect these suggestions. <br />l <br />B10 <br />The information has been acknowledged. No further response is required <br />B 11 <br />Sludge and ash will not be accepted; tires and appliances will be accepted. The Project Description <br />(Chapter 2.0) has been revised to include this information, as well as how these wastes will be handled. <br />B12 <br />The applicants have not yet determined if a wood grinder will be purchased and kept at the facility or if <br />grinding will be done on;a periodic basis by contract. Permits are being obtained for the eventual <br />purchase and full-time storage and operation of a grinder. <br />ER -93-1 -14- (11-23-93) <br />