Laserfiche WebLink
m m m� m mm mm M am® M M! M M <br />TABLE 3.1 SUMMARY TABLE OF SIGNIFICANT IMPACTS AND MITIGATION MEASURES <br />...:: ....:. :::: >;...... :;: <br />WILL IMPACT BE: LESS <br />_. <br />POTENTIALLY:;:$IGNIFICANT:IMPACTS:.. ;;: <br />.: ,::..: .:. <br />MEASURES:: <br />SUGGESTED MITIGATION'ME SURES <br />THAN SIGNIFICANT? <br />Air Quality <br />Construction activities such as clearing, excavation, and grading <br />Prior to construction, a PM -10 Dust Prevention and Control <br />Yes. <br />operations, construction vehicle traffic, and wind blowing over <br />Plan shall be prepared that specifies dust control measures, <br />exposed earth would generate exhaust emissions and fugitive <br />demonstrates the availability of needed equipment and <br />particulate matter emission. <br />personnel, and identifies a responsible individual for <br />implementation. The plan shall Include the following: <br />• Suspend dust producing activities during high winds <br />equal to or greater than 20 mph. <br />• Sprinkle exposed and disturbed soil surfaces during <br />the dry season and as needed to control fugitive dust. <br />• Sprinkle temporary soil stockpiles. Soils to be <br />stockpiled longer than three months shall be seeded. <br />• Require a speed limit on the site of 15 m.p.h. or less. <br />• Disturbed but inactive portions of the site shall be <br />watered with a dust suppressant, covered, or <br />reseeded. <br />• Materials transported by truck shall be covered or <br />wetted down to control dust. <br />• The entire paved area is to be cleaned as needed to <br />control fugitive dust. <br />The transfer station would create a number of odor sources. <br />Clean the tipping floor and transfer trailers daily or <br />Yes. <br />as required by the local Enforcement Agency, and periodically <br />steam clean the transfer trailers. Because the sorting, <br />recycling, and transfer operations will take place within the <br />transfer station building, exposure of wastes to the atmosphere <br />is reduced and , which will mitigate for odors. Develop <br />standard operating procedures (SOP) to address the <br />elimination of the generation and emission of odors. <br />Visual/Aesthetics <br />The facility shall provide for the daily collection of litter on the <br />Yes <br />site and on adjacent properties. <br />Potential litter along the access road, surrounding properties, <br />and at the site. <br />ER -93-1 -25- (9-27-93) <br />