Laserfiche WebLink
File No. 20-1008-36 KLEINFELDER <br /> May 20, 1996 <br /> Page 2 of 9 TABLE <br /> Dry Laboratory specified <br /> Test Moisture Density Compaction Relative Relative <br /> No. Date Test Location %Dry Wt. P.C.F. Curve No. Comvaction Conyaction <br /> 1995 FOUNDATION LAYER <br /> 1 6-07 N9050 E9375 12.6 79 1 61 90 <br /> 2 6-07 N8875 E9300 5.2 133 1 100 90 <br /> 3 6-07 N8825 E9250 4.8 129 1 98 90 <br /> 4 6-07 N8575 E9175 4.0 127 1 97 90 <br /> 5 6-07 N8400 E9225 3.9 127 2 95 90 <br /> 6 6-07 N8625 E9450 , 3.7 134 2 100 90 <br /> 7 6-07 N8450 E9575 7.9 127 2 95 90 <br /> 8 6-07 Retest of#1 12.6 79 1 61 90 <br /> 9 6-29 N8800 E9600 2.8 128 3 99 90 <br /> 10 6-29 N8725 E9850 4.2 123 3 95 90 <br /> 11 6-29 Retest of#8 4.9 121 3 94 90 <br /> 12 6-29 N8875 E9925 3.4 122 3 94 90 <br /> 13 6-29 N8775 E10025 5.1 124 3 96 90 <br /> 14 6-29 N8825 E10225 3.6 119 3 92 90 <br /> 15 6-29 N9050 E10250 4.2 125 4 92 90 <br /> 16 6-29 N9225 E10275 4.4 123 4 90 90 <br /> 17 6-29 N9025 E10400 5.3 123 4 91 90 <br /> 6-29 N9125 E10525 3.2 125 4 92 90 <br /> 19 6-29 N9250 E10725 4.1 127 4 93 90 <br /> 20 6-29 N9300 E10425 4.0 120 7 93 90 <br /> 21 6-29 N9325 E10150 5.1 120 6 90 90 <br /> 22 6-29 N9450 E10775 4.5 125 5 95 90 <br /> 23 6-29 N9500 E10500 4.7 122 5 94 90 <br /> 24 6-29 N9525 E10250 6.2 128 5 98 90 <br /> 25 6-29 N9675 E10325 7.7 119 5 91 90 <br /> 26 6-29 N9700 E10125 5.3 121 5 93 90 <br /> 27 6-29 N9400 E10050 6.4 125 5 96 90 <br /> 28 6-29 N9695 E10075 6.3 121 6 90 90 <br /> 29 6-29 N9475 E9950 6.0 122 6 91 90 <br /> 30 6-29 N9525 E9825 6.8 123 6 92 90 <br /> 31 6-29 N9325 E9775 6.4 126 6 94 90 <br /> 32 6-29 N9400 E9625 9.5 126 6 94 90 <br /> 33 6-29 N9200 E9500 9.0 124 6 92 90 <br /> 34 6-29 N9400 E9550 8.2 125 7 97 90 <br /> 35 6-29 N9100 E9625 7.4 122 7 94 90 <br /> 36 6-29 N9175 E9675 4.5 125 7 96 90 <br /> 37 6-29 N8950 E9725 3.4 122 7 94 90 <br /> 38 6-29 N9175 E9850 3.8 124 7 96 90 <br /> 6-29 N9325 E9875 5.1 120 7 93 90 <br /> 6-29 N9375 E10050 4.6 123 7 95 90 <br /> Accepted engineering and testing procedures were used for these terms. We do not undertake the guarantee of conduction,nor do we relieve the contractor of his primary responsibility to produce <br /> a completed project conforming to the project plans and specifications. Copyright 1996 laehrfehter,Inc. <br />