Laserfiche WebLink
' 4.0 ESTIMATED PROJECT SCHEDULE <br />The schedule provides the Groundwater Monitoring Well Installation Report to the RWQCB <br />by December 15, 2011 and the EMP report to the RWQCB by February 1, 2012 (Figure 5). <br />Note that specific task dates are contingent upon gaining property access and obtaining well <br />permits. If the schedule must be altered as a result of permitting, property access, <br />inclement weather, or other unforeseen conditions, the County will request an extension of <br />the schedule from the RWQCB as soon as possible <br />5.0 CONCLUSION <br />This Workplan is based on the limited site information referenced herein. GLA should be <br />notified of any conditions that differ from those described herein since this may require a <br />re-evaluation of the data, conclusions, and work plans presented herein. This Workplan <br />was not prepared for use by other parties and projects other than those named or <br />described above. It may not contain sufficient information for parties or other purposes. <br />This Workplan was prepared in accordance with generally accepted geotechnical and <br />hydrogeologic practices, and makes no warranties, either expressed or implied, as to the <br />professional data presented in it. <br />Geo -Logic Associates <br />I <br />ohn M. Hower, PG, CEG <br />Supervising Geologist <br />G �� <br />Sarah J. Batt Ile, PG, CHG <br />Vice President <br />15 <br />2011-0115 CHSL EMP Workplan Geo -Logic Associates <br />Revision 1- August 24, 2011 <br />