Laserfiche WebLink
0 0 Page 1 of 1 <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Thursday, September 29, 2011 8:01 AM <br />To: Natalia Subbotnikova [EH] <br />Cc: Michael Carroll <br />Subject: Corral Hollow _EMP Schedule <br />Importance: High <br />Hello Natalia <br />We have scheduled the Evaluation Monitoring Program (EMP) work near our Corral Hollow <br />Landfill in reference to SR # 6316 and 6317 and the submitted EMP work plan. This <br />notification is made based on the drilling permit requirements. <br />1. Drilling of three (3) borings and groundwater (GW) sampling: October 10th through <br />17th. During this time, the drilling work will only take place. Our understanding is that <br />drilling work will not require EHD inspections. <br />2. Well Installation or well abandonment (Based on the results of the GW samples): <br />October 31St to November 7th <br />The driller has been notified about EHD's inspection time from 9:00am to 3:30 pm. We will call <br />you 24hrs before October 31 st and inform you the approximate time the driller will be ready for <br />the first inspection for either well installation or abandonment. We will notify you about other <br />consecutive inspections after the first inspection in the field. <br />Let me know if you need any additional information. <br />Thanks <br />JOYESH CHANDRA <br />SAN JOAQUIN COUNTY <br />PUBLIC WORKS DEPARTMENT <br />SOLID WASTE DIVISION <br />1810 E. HAZELTON AVE <br />STOCKTON, CA 95201 <br />PH: (209) 468-3066 <br />FAX: (209) 468-3078 <br />Email:ichandra@sjgov.org <br />9/29/2011 <br />