My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:41:31 PM
Creation date
7/3/2020 11:04:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />Mr. Todd Del Frate -2- <br />'FINAL COVER EXPANSION D N CORRAL HOLLOW SANITARY LAN L <br />mm <br />Closure Cover Construction Schedule <br />Date Completed <br />Comments and approval Review by regulatory <br />October 24, 2011 <br />agencies received <br />Shaw Incorporates regulatory agency comments <br />November 14, 2011 <br />Review and revisions by Public Works Design Division <br />December 12, 2011 <br />complete <br />Submit package to Board of Supervisors <br />January 9, 2012 <br />Bid advertised - start of bid period (see note) <br />January 31, 2012 <br />Bid Opening: <br />March 1, 2012 <br />Contract Awarded <br />March 20, 2012 <br />Begin Construction (start of new fiscal year — see <br />July 9, 2012 <br />note) <br />Construction complete <br />September 3, 2012 <br />Note: The cost estimate assumes bidding in the winter as shown here, taking advantage of contractor "slow time". <br />
The URL can be used to link to this page
Your browser does not support the video tag.