Laserfiche WebLink
M. Trench Beneath Closure Barrier <br />a. Trench through cover barrier will be paid per linear foot at the price identified <br />in the Bid Sheet. <br />b. Payment includes excavation, removal and proper disposal of refuse if <br />encountered, placement of pipe as required, backfill of trench as shown on the <br />construction drawings and specified here -in, compaction of backfill and <br />leveling soil backfill to match existing grade. <br />N. 3 -Inch Gate Valve <br />a. 3 -inch gate valve will be paid per unit installed at the price identified in the Bid <br />Sheet. <br />b. Payment includes valve, bolts, nuts and washers, sampling valve, and <br />associated fittings. <br />O. 4 -Inch Gate Valve <br />a. 4 -inch gate valve will be paid per unit installed at the price identified in the Bid <br />Sheet. <br />b. Payment includes valve, bolts, nuts and washers, sampling valve, and <br />associated fittings. <br />P. Valve Box <br />1. Valve box will be paid per unit installed at the price identified in the Bid Sheet. <br />2. Payment includes valve box, digging, backfill, and marking. <br />Q. Connection To LFG Header <br />1. Connection to LFG header will be paid per unit connection at the price identified in <br />the Bid Sheet. <br />2. Payment includes drilling into the HDPE header; providing branch saddles, bolts, <br />nuts and washers, and associated fittings. <br />R. Bollards <br />1. Bollards will be paid per unit installed at the price identified in the Bid Sheet. <br />2. Payment includes installation of the bollards as shown in the construction drawings <br />and for painting. All scratches shall be repainted. <br />On -Call LFG System Maintenance Contractor 14 <br />San Joaquin County Purchasing Department <br />