My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:41:31 PM
Creation date
7/3/2020 11:04:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. Trench Beneath Closure Barrier <br />a. Trench through cover barrier will be paid per linear foot at the price identified <br />in the Bid Sheet. <br />b. Payment includes excavation, removal and proper disposal of refuse if <br />encountered, placement of pipe as required, backfill of trench as shown on the <br />construction drawings and specified here -in, compaction of backfill and <br />leveling soil backfill to match existing grade. <br />N. 3 -Inch Gate Valve <br />a. 3 -inch gate valve will be paid per unit installed at the price identified in the Bid <br />Sheet. <br />b. Payment includes valve, bolts, nuts and washers, sampling valve, and <br />associated fittings. <br />O. 4 -Inch Gate Valve <br />a. 4 -inch gate valve will be paid per unit installed at the price identified in the Bid <br />Sheet. <br />b. Payment includes valve, bolts, nuts and washers, sampling valve, and <br />associated fittings. <br />P. Valve Box <br />1. Valve box will be paid per unit installed at the price identified in the Bid Sheet. <br />2. Payment includes valve box, digging, backfill, and marking. <br />Q. Connection To LFG Header <br />1. Connection to LFG header will be paid per unit connection at the price identified in <br />the Bid Sheet. <br />2. Payment includes drilling into the HDPE header; providing branch saddles, bolts, <br />nuts and washers, and associated fittings. <br />R. Bollards <br />1. Bollards will be paid per unit installed at the price identified in the Bid Sheet. <br />2. Payment includes installation of the bollards as shown in the construction drawings <br />and for painting. All scratches shall be repainted. <br />On -Call LFG System Maintenance Contractor 14 <br />San Joaquin County Purchasing Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.