My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:41:31 PM
Creation date
7/3/2020 11:04:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�t <br /> California 06gional Water Quality Co of Board :-° ... <br /> Central Valley Region <br /> Katherine Hart,Chair <br /> Londa S.Adams 11020 Sun Center Drive#200, Rancho Cordova,California 95670-6114 Arnold <br /> Secretary for Phone(916)464-3291 -FAX(916)464-4645 Schwarzenegger <br /> Environmental <br /> Protection http://www.waterboards.ca.gov/centraIvalley <br /> V <br /> RECEEb <br /> REQUIREMENTS FOR MONITORING WELL INSTALLATION WORKPLAW 2 2011 <br /> AND <br /> MONITORING WELL INSTALLATION REPORTS ENVIRONMEIVAL HEALTH <br /> SECTION 1 - Monitoring Well Installation Workplan <br /> A. General Information: <br /> 1. Purpose of well installation and sampling/analysis project <br /> 2. Site location map <br /> 3. Copies of County Well Construction Permits (to be submitted after workplan review) <br /> 4. New monitoring well locations and rationale <br /> 5. Equipment decontamination procedures <br /> 6. Health and safety plan <br /> 7. Topographic map showing any existing wells, proposed wells, waste handling <br /> facilities, utilities, and other major physical and man-made features. <br /> B. Drilling Details: <br /> 1. Drill rig and contractor <br /> 2. Sampling intervals and logging methods. <br /> C. Monitoring Well Design-Graphic and Descriptive: <br /> 1. Casing diameter and centralizer spacing (if needed) <br /> 2. Borehole diameter <br /> 3. Depth of surface seal <br /> 4. Well construction materials <br /> 5. Diagram of proposed well construction details <br /> 6. Type of well cap, bottom cap either screw on or secured with stainless steel screws <br /> 7. Size of perforations and rationale <br /> 8. Grain size of sand pack and rationale <br /> 9. Thickness and position of bentonite seal and sand pack <br /> 10.Depth of well, length and position of perforated interval <br /> D. Well Development: <br /> 1. Method development <br /> 2. Method of determining when development is complete <br /> 3. Parameters to be monitored during development <br /> 4. Development water storage and disposal. <br /> E. Well Survey Coordinates, horizontal and vertical <br /> 1. Name of the Licensed Land Surveyor or Registered Civil Engineer <br /> 2. Well features to be surveyed (i.e. top of casing, horizontal and vertical coordinates) <br /> 3. Horizontal (within 0.1 foot) and vertical accuracy (vertical must be at least 0.01-foot). <br /> F. Water Level Measurement: <br /> 1. The elevation reference point at each monitoring well must be within 0.01-foot <br /> 2. Ground surface elevation at each monitoring well must be within 0.01-foot <br /> California Environmental Protection Agency <br /> co Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.