Laserfiche WebLink
• <br />WORKPLAN <br />EVALUATION MONITORING PROGRAM <br />CORRAL HOLLOW SANITARY LANDFILL <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />TABLE OF CONTENTS <br />3.0 EVALUATION MONITORING PROGRAM...................................................................... 5 <br />1.0 INTRODUCTION..........................................................................................................1 <br />EMP APPROACH...................................................................................................... 5 <br />2.0 BACKGROUND............................................................................................................1 <br />3.2 <br />2.1 SITE LOCATION........................................................................................................ 2 <br />6 <br />2.2 SITE GEOLOGY......................................................................................................... 2 <br />3.3 <br />2.3 GROUNDWATER CONDITIONS................................................................................ 3 <br />2.4 GROUNDWATER CHEMISTRY.................................................................................. 4 <br />3.0 EVALUATION MONITORING PROGRAM...................................................................... 5 <br />5.0 CONCLUSION............................................................................................................15 <br />FIGURES <br />Figure 1 Site Location Map <br />Figure 2 Existing Groundwater Monitoring Wells <br />Figure 3 Proposed Groundwater Monitoring Wells <br />Figure 4 Typical Groundwater Monitoring Well Construction Detail <br />ATTACHMENTS <br />Attachment 1 Project Schedule <br />Attachment 2 Site Health and Safety Plan <br />Revision 1- August 24, 2011 <br />3.1 <br />EMP APPROACH...................................................................................................... 5 <br />3.2 <br />MONITORING WELL LOCATION RATIONALE........................................................... <br />6 <br />3.3 <br />BOREHOLE DRILLING AND HYDROPUNCHTM SAMPLING ......................................... 7 <br />3.3.1 Well Permitting ........................................................................................ 7 <br />3.3.2 Drilling, Soil Sampling, and Logging Methods ............................................ 7 <br />3.4 <br />3.3.3 HydropunchTM Sampler and Initial Groundwater Sampling ....................... 8 <br />MONITORING WELL INSTALLATION.................................................................... 9 <br />3.4.1 Borehole Reaming and Soil Sampling......................................................... 9 <br />3.4.2 Monitoring Well Construction................................................................... 9 <br />3.4.3 Surveying...................................................................................................10 <br />3.4.4 Monitoring Well Development................................................................. <br />10 <br />3.4.5 Aquifer Testing.......................................................................................... <br />3.3.7 Groundwater Sampling and Analysis........................................................ <br />11 <br />11 <br />3.5 <br />MONITORING WELL INSTALLATION REPORT........................................................ <br />13 <br />3.6 <br />EVALUATION MONITORING PROGRAM REPORT .................................................. <br />13 <br />4.0 ESTIMATED PROJECT SCHEDULE............................................................................... <br />15 <br />5.0 CONCLUSION............................................................................................................15 <br />FIGURES <br />Figure 1 Site Location Map <br />Figure 2 Existing Groundwater Monitoring Wells <br />Figure 3 Proposed Groundwater Monitoring Wells <br />Figure 4 Typical Groundwater Monitoring Well Construction Detail <br />ATTACHMENTS <br />Attachment 1 Project Schedule <br />Attachment 2 Site Health and Safety Plan <br />Revision 1- August 24, 2011 <br />