My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 9:18:01 PM
Creation date
7/3/2020 11:04:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.0 FINAL COVER <br /> 8.1 AREA OF CLOSURE CAP EXTENSION <br /> The County will extend the closure cap ten feet beyond the determined edge of <br /> refuse (Plan Sheet 3). . <br /> TABLE 2 <br /> CHSL Closure Area <br /> PORTION AREA (Acres) <br /> Previously Closed 43 <br /> Closure Cap Extension <br /> (County.- 1 .3 acres 1 .6 <br /> Caltrans: 0.3 acres) <br /> Total Closed Area 44.6 <br /> The final closure cap extension project will be in accordance with Title 27 <br /> Section 21090, substituting geocomposite clay liner (GCL) as the engineered <br /> alternative to the prescriptive one-foot thick clay barrier layer (Plan, Sheet 3, 5). <br /> GCL will be placed over the Shell Oil pipeline in "break-away panels" to allow <br /> access to the pipeline with minimal damage to the barrier layer. If removed for <br /> future pipeline repair, the break-away panels will be replaced and the closure of <br /> this area will be re-certified. <br /> In accordance with Title 27 section 20323 and 20324, A Construction Quality <br /> Assurance (CQA) plan has been prepared for the closure cap extension project <br /> (Appendix 1). . This plan I describes the procedures and protocols to ensure that <br /> the final cover will comply with the closure regulations of Title 27, Section 21710. <br /> All work for the closure extension project will be done in accordance with the CQA <br /> plan. A third party engineering firm will monitor the closure certification. <br /> 8.2 FOUNDATION LAYER <br /> Preparation in the closure cap extension area will involve removing the existing <br /> soil specified in the technical specifications. <br /> Closure Plan Revised Addendum San Joaquin County <br /> Corral Hollow Sanitary Landfill 6 Department of Public Works <br /> October 6, 2011 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.