My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
Archived Reports
>
ARCHIVED REPORTS_2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 9:18:01 PM
Creation date
7/3/2020 11:04:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2011
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2011.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance(CQA) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21, 2008 <br /> Construction Quality Assurance Staff. Reporting responsibilities maybe adjusted by <br /> the Owner, as needed. <br /> 9.3 Document Format <br /> This CQA Plan is divided into the following five sections: <br /> ♦ Section 1 is the introduction and presents the document format and <br /> definitions and terms used throughout the document. <br /> ♦ Section 2 presents general requirements of the CQA program and <br /> organization. <br /> ♦ Sections 3 and 4 present special requirements for specific work items of <br /> the construction, including procedures such as materials verification, test <br /> standards, testing frequencies, conformance and construction testing, and <br /> construction monitoring for each work item. <br /> ♦ Section 5 presents methods of documentation and record keeping. <br /> All parties involved in the construction will be thoroughly familiar with this document, <br /> the project construction drawings, and the technical specifications. <br /> 1.4 Reference Documents <br /> The following reference documents provide background information and support this <br /> CQA Plan for construction: <br /> ♦ American Society for Testing and Materials (ASTM) Annual Book of <br /> ASTM Standards. Section 4 Construction, Volume 04.02 Concrete and <br /> Aggregates. <br /> ♦ American Society for Testing and Materials (ASTM) Annual Book of <br /> ASTM Standards. Section 4 Construction, Volume 04.08 Soil and Rock(I), and <br /> Volume 04.09 Soil and Rock (I1) <br /> ♦ American Society for Testing and Materials (ASTM) Annual Book of <br /> ASTM Standards. Section 8 Plastics, Volumes 08.01 Plastics (I), 08.02 <br /> Plastics (1I), and 08.03 Plastics (III). <br /> ♦ American Association of State Highway and Transportation Officials <br /> (AASHTO), Specifications and Volume I1 Tests. <br /> 10 <br /> Vector Engineering, Inc. •143E Spring Hill Drive*Grass Valley, CA • (530) 272-2448 <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.