Laserfiche WebLink
TABLE 1 <br /> AMMENDED POSTCLOSURE MAINTENANCE COST <br /> CORRAL HOLLOW LANDFILL <br /> ITEM TASKS COST <br /> NO Per Year <br /> (2011 dollars) <br /> INTIAL CLOSURE AREA <br /> 1 Re-vegetation/Erosion Control $ 6,766 <br /> Landfill Gas Management <br /> 2 System Maintenance/Monitoring _ $ 12,600 <br /> 3 Groundwater And Surface Water Monitoring $ 27,000 <br /> 5 Final Cover Maintenance $ 10,000 <br /> 6 Drainage System Maintenance $ 5,000 <br /> 7 Inspections _ $ 5,500 <br /> 8 Topographic Monitoring $ 3,000 <br /> s LFG Collection System $ 15,300 <br /> Operation/Maintenance <br /> INTIAL CLOSURE AREA SUB-TOTAL: $ 85,166 <br /> EXTENDED CLOSURE CAP <br /> (BOTH COUNTYAND CALTRANS AREA) See Note 2 <br /> 10 Final Cover Inspection $ 660 <br /> 11 Final Cover Maintenance $ 1,200 <br /> 12 Re-vegetation/Erosion Control $ 812 <br /> EXTENDED CLOSURE CAP AREA SUB-TOTAL: $ 2,672 <br /> TOTAL AMMENDED POMP COST $ 87,838 <br /> Notes: <br /> 1 Closure cap extension area costs escalated based on 12% proportional increase <br /> of closure cap area. <br /> 2 County and Caltrans intend that Caltrans property containing refuse will be transferred to the <br /> County. <br /> Postclosure Plan Addendum <br /> Corral Hollow Sanitary Landfill San Joaquin County <br /> October 10,2011 Department of Public Works <br /> WlCorral HollovACH Closure&PCMP E-DocsTinal Closure Plan Addendum_Revsied Oct 2011\CH-Postclo Maint Cost_revsied 10-10-11.xls Solid Waste Division <br />