My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2007 (1/07 - 6/07)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2007 (1/07 - 6/07)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:34:59 PM
Creation date
7/3/2020 11:06:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2007 (1/07 - 6/07)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2007 (1/07 - 6/07).tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corral Hollow Sanitary Landfill - 2 - 5 February 200 <br /> h <br /> 1. By 15 February 2007, the Discharger shall initiate an Evaluation Monitoring Program <br /> and submit a work plan to delineate the release of VOCs and chloride at CHSL in <br /> accordance with Title 27, Section 20425(b). This Program shall determine both the <br /> lateral and vertical extent of the release in the vadose zone and groundwater. The work <br /> plan should include a soil gas and groundwater step-out/step-down investigation of the <br /> northern site boundary and northeast of well MW-5, including offsite investigation if <br /> necessary. Staff recommends an additional groundwater monitoring well be installed <br /> along the northern site boundary to monitor the shallow groundwater zone for VOCs, <br /> chloride and other constituents in the vicinity of the CHSL access road. This work plan <br /> shall include all of the information requested within the enclosed, Requirements for <br /> Monitoring Well Installation Workplans and Monitoring Well Installation Reports <br /> (Attached). <br /> 2. By 30 April 2007, the Discharger shall submit an Assessment Delineation Release <br /> Report. This report shall meet the objective described in Title 27, Section 20425(b). <br /> 3. The Discharger shall update and submit to the Regional Water Board staff an <br /> Engineering Feasibility Study within 90 days (30 July 2007) of establishing an <br /> evaluation monitoring program per Title 27, Section 20425(c). <br /> 4. The Discharger shall submit an amended report of waste discharge (ROWD) in <br /> accordance with Title 27, Section 20425(d) by 30 July 2007. <br /> If you have any questions or need further assistance regarding compliance with this letter, <br /> please contact me at (916) 464-4737. <br /> Todd A. Del Frate <br /> Engineering Geologist <br /> Lower San Joaquin River Watershed <br /> Discharge to Land Unit <br /> Enclosure(s) Requirements for Monitoring Well Installation Workplans and Monitoring <br /> Well Installation Reports <br /> cc: Gino Yetka, Closure and Technical Services, CIWMB <br /> Desi Reno, San Joaquin County Public Works <br /> Robert McClellon, San Joaquin County Environmental Health Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.