complete, the screen and well casing (fitted with end cap)will be suspended in the center of the <br /> hollow stem auger so that the screen interval occurs at the well design depth. The hollow stem <br /> augers (HSAs)will slowly be removed from the borehole as the sand pack is placed around the <br /> screen with the HSA serving as a tremie pipe. During placement of the sand pack, frequent <br /> measurement of the top of the sand pack will be made to ensure that the bottom of the HSA is <br /> not above the top of the sand pack. <br /> Before placing the bentonite seal, the sand pack will be carefully surged and then re-measured to <br /> ensure correct sand pack position. All well installation procedures will follow CHSL drilling <br /> specification Section 02670 (Appendix A). <br /> The geologist will record all well completion details on the geologic boring log. After well <br /> MW-8 has been installed, a State-Licensed surveyor will perform a vertical and horizontal <br /> survey of the top of casing. The surveyor will utilize the nearest benchmark(s) for vertical <br /> control relative to mean sea level and the appropriate monuments for horizontal control for the <br /> survey. <br /> 2.2.3 Well Development <br /> Well MW-8 will be developed using a combination of bailing, surging, and pumping techniques. <br /> Equipment used during the well development procedure will be cleaned using a steam cleaner or <br /> an Alconox®, or equivalent, detergent solution rinse prior to use at each well location. <br /> During development, field parameters(pH,temperature, conductivity,turbidity, and suspended <br /> sediment)will be monitored and recorded. The well will be developed until field parameters are <br /> stable and the discharged water is relatively clear of suspended sediment. <br /> Measurements of turbidity, temperature, conductivity,pH, and volume of purged water and <br /> observations of purge water clarity and sediment content will be recorded on a well development <br /> data form and will be included in the report. <br /> All development water will be dispersed on the ground next to the well location. A dedicated <br /> submersible pump will be installed that will be similar to the existing pumps. <br /> 2.2.4 Well Sampling <br /> Well MW-8 will be sampled in accordance with WDR Order No. 5-01-176 and the monitoring <br /> program. Sampling will occur at the next scheduled monitoring event after the well is installed. <br /> Corral Hollow EMP WP.DOC 2.4 February 28,2007 <br />