Drilling and completion of the well will be done by a licensed contractor. The contractor <br />will be responsible to comply with the work plan and construct the well per the <br />construction drawings and specifications. <br />The location of the new wells is away from refuse limit; thus, drilling of the new wells does <br />not include excavation of refuse or contact with refuse. <br />Drilling muds or liquids will not be used during drilling. All drilling equipments are <br />expected to be clean. The contractor will be required to clean all unclean equipments off- <br />site. Spoil will be dispersed around the drilled boring. All construction debris will be <br />removed from the site by the drilling contractor. <br />Any open excavations deeper than three feet will be covered with a one -inch thick piece <br />of plywood at the end of the working day. The edges of the plywood will be sealed <br />around with soil to prevent landfill gas from escaping into the atmosphere. The plywood <br />covered area will also be flagged with warning tape <br />A boring log will be compiled during the drilling of the well by SCS Engineers. <br />The new soil gas monitoring well, GW -1 A, will be constructed per the construction <br />drawings and specifications. Comments received from EHD will be incorporated into the <br />construction of GW -1A. <br />It is anticipated that GW -1A will be constructed immediately after drilling. Unless <br />otherwise directed, GW -1A will be completed in the presence of EHD Unit 6 staff. <br />The installation of GW -1A well has tentatively been scheduled to begin on April 10tH <br />2008. <br />Work Plan — Soil Gas Monitoring Well (GW1-A) Installation San Joaquin County <br />Corral Hollow Sanitary Landfill Public Works Department <br />April 3, 2008 Page 4 of 7 Solid Waste Division <br />