My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (1/08 TO 6/08)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (1/08 TO 6/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:38:57 PM
Creation date
7/3/2020 11:06:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (1/08 TO 6/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2008.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 Page 1 of 1 <br />Natalia Subbotnikova [EH] <br />From: Jaime Perez (jperez@sjgov.org] <br />Sent: Wednesday, June 04, 2008 2:12 PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Desi Reno; Michael Carroll; Robert McClellon [EH]; Marcus Davenport; Billy Baier; Jo Baker; Felipe <br />Maldonado; Jack Thompson; Diego Chavez; Maria Orozco; Roy Constantino; Manuel Chavez; Greg <br />Scheffel <br />Subject: HARNEY LANE SANITARY LANDFILL AND CORRL HOLLOW SANITARY LANDFILL <br />Good afternoon Natalia, <br />As discussed yesterday, we're in the process of making arrangements to use sheep at the <br />Harney Lane Landfill to control the vegetation. We expect to have the sheep on site within 2 — <br />4 weeks. In the meantime, we'll continue to mow the areas where you noted erosion problems <br />during your March 2008 inspection and make the necessary repairs by June 30th. It will take <br />some time for the sheep to graze the entire site. They will definitely not do so before your next <br />quarterly inspection. At this time, we expect the sheep to graze the entire site by the end of <br />September. <br />As you know, there are sheep already at the Corral Hollow Sanitary Landfill. They were placed <br />there on Wednesday, May 21 It. Likewise, we don't expect them to graze the entire site before <br />your next quarterly inspection. However, they're making good progress and we expect that <br />they too will graze the entire site by September 30th <br />If you have any questions, please let me know. <br />Thank you. <br />Jaime L. Perez <br />Solid Waste Operations Manager <br />County of San Joaquin <br />Department of Public Works - Solid Waste Division <br />P.O. Box 1810 <br />Stockton, CA 95201 <br />P = 209.468.3066 <br />F = 209.468.3078 <br />6/5/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.