My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1993-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 2:10:13 PM
Creation date
7/3/2020 11:06:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1996
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1993-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s , <br /> 0 <br /> Certain information in FCL's ammended RDSI is unacceptable and/or incomplete and <br /> corrected addendum information is required. <br /> What specifically is FCL doing to ensure soil stockpile availability on site? When <br /> available stockpile is on site why are wastes continually uncovered or inadequately <br /> covered? Specifically what will FCL do to resolve this problem and how will FCL soil <br /> cover during muddy conditions and when it is "impossible" to use Covertech? <br /> Wastes must absolutely be covered with 6" of soil Friday evening to Monday morning <br /> every weekend irregardless of wet weather conditions. 12" of soil cover must overlay <br /> all intermediate cover areas at all times. 6" of soil must be used as daily cover any <br /> and every time it is impossible to use Covertech. These are the only two approved <br /> cover materials. No other material will be allowed as cover at this time. Correct the <br /> information in the FSL RDSI ammendment. <br /> Rips and tears in Covertech must be mended before it may be used as cover. A <br /> backup Covertech must be on site at all times. Where will FSL store the backup <br /> cover? <br /> All wastes must be completely covered by Covertech or soil Monday through <br /> Thursday and soil only Friday through Monday. <br /> The ADC Covertech use proposed for FCL will not be approved until these problems <br /> are resolved. The ADC Covertech project is terminated unless corrected RDSI <br /> ammendment information is received by EHD by June 5, 1995. Contact Carol Oz, <br /> R.E.H.S. if you have questions. <br /> Ernest Fujimoto, M.D., M.P.H. <br /> Acting Health Officer <br /> z�w 111&0e�v— <br /> Mike Huggins, Supervisor <br /> Environmental Health Division <br /> cc: City of Stockton, Mike Miller <br /> City of Stockton, John Carlson <br /> Gambi Enterprises, Phil Giambastiani <br /> CIWMB, Cody Bagley <br /> CRWQCB,Arnold Inouye <br />
The URL can be used to link to this page
Your browser does not support the video tag.