My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1993-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 2:10:13 PM
Creation date
7/3/2020 11:06:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1996
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1993-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I Holiday Schedule <br />The Austin Road and French Camp Landfills will be closed on December 25th and <br />January I st. The Austin Road Landfill will be opened the Saturdays following each <br />holiday to catch up. The French Camp Landfill will not be opened on the succeeding <br />Saturdays. <br />Action: None <br />2. Coordination of Disposal at French Camp <br />City noted that in the spring and summer, when the volume coming into French Camp <br />lessens, coordination of dumping waste at the French Camp active face would assist the <br />City and Gambi in reducing the amount of work needed to maintain the landfill. City <br />requested CalWaste's assistance. CalWaste agreed to work with the City and Gambi. <br />Action: None. The issue will be revisited when the peak winter volumes <br />are over. <br />3. ODenins! of Bas at French Camp GrindingPad <br />CalWaste stated that they did not feel the intent of the contract was to require the opening <br />of every trash bag received. City stated that they disagreed and that every bag should be <br />opened. It was agreed that if a bag was opened and found to contain a majority of trash <br />that the bag could be separated into a waste bin. <br />Action: CalWaste to insure bags are opened. <br />ALT, <br />MEMORANDUM <br />r <br />Date: <br />December 22, 1995 <br />To: <br />Stephen Chen <br />Attendees <br />From: <br />Bob Murdoch, Senior Civil Engineer <br />Subj.: <br />LANDFILL OPERATIONS WEEKLY MEETING FOR DECEMBER 19, <br />1995 <br />Attendees: <br />Bob Murdoch, City of Stockton <br />Phil Nisperos, City of Stockton <br />Stephen Chen, City of Stockton <br />Mike Miller, City of Stockton <br />Rick Vidas, Gambi Enterprises <br />Thom Sanchez, California Waste <br />Fred Nishizaki, California Waste <br />Ron Penix, City of Stockton <br />Mark Rushing, City of Stockton <br />Dennis Young, Pacific Energy <br />I Holiday Schedule <br />The Austin Road and French Camp Landfills will be closed on December 25th and <br />January I st. The Austin Road Landfill will be opened the Saturdays following each <br />holiday to catch up. The French Camp Landfill will not be opened on the succeeding <br />Saturdays. <br />Action: None <br />2. Coordination of Disposal at French Camp <br />City noted that in the spring and summer, when the volume coming into French Camp <br />lessens, coordination of dumping waste at the French Camp active face would assist the <br />City and Gambi in reducing the amount of work needed to maintain the landfill. City <br />requested CalWaste's assistance. CalWaste agreed to work with the City and Gambi. <br />Action: None. The issue will be revisited when the peak winter volumes <br />are over. <br />3. ODenins! of Bas at French Camp GrindingPad <br />CalWaste stated that they did not feel the intent of the contract was to require the opening <br />of every trash bag received. City stated that they disagreed and that every bag should be <br />opened. It was agreed that if a bag was opened and found to contain a majority of trash <br />that the bag could be separated into a waste bin. <br />Action: CalWaste to insure bags are opened. <br />
The URL can be used to link to this page
Your browser does not support the video tag.