Laserfiche WebLink
The sedimentation pond and 2500 lineal feet of concrete lined storm <br />water drainage ditch has been constructed. Tentative plans are to <br />construct a temporary dirt berm around the remaining perimeter to <br />prevent storm water from draining off the landfill. <br />The groundwater gradient and velocity results for June 23, 1994 <br />calculates the flow in the easterly direction at a velocity rate of <br />20.7 ft. per year to 330 ft. per year. <br />The Quantity of Garden Refuse material delivered to French Camp <br />Landfill for the 2nd Quarter of 1994 was 8,779.09 tons. <br />The elevation of land filled material placed, during the 2nd quarter <br />was between elevation 38 to elevation 42. See attached map. <br />Statistical analysis of monitoring data results were mailed in to <br />Steve Rosenbaum on June 30, 1994. <br />