Laserfiche WebLink
III.A.3. Construction Sequencing <br /> Plans <br /> III.A.3.a. Excavation/Stockpiling 14 CCR 17680 The following drawings show the construction sequence of the Appendix B, <br /> Plans landfill: CEP Dwg. P2 <br /> P2: Excavation and Site Preparation Plan: <br /> - Borrow area (daily/intermediate, final cover). <br /> - Soil stockpiling area (most cell excavation will be used <br /> directly as daily cover and not stockpiled; additional <br /> excavation at construction will be stockpiled). <br /> - Base grades superimposed in pre-disposal topography. <br /> III.A.3.b. Base Preparation/Liner Drawings P3 and P4 show liner contours for each individual Appendix B, <br /> Placement Plans phase. CEP Dwg. P3, <br /> CEP Dwg. P4 <br /> III.A.3.c. Fill Sequencing Plans 14 CCR 18222(g) Drawings P3 and P4 show: Appendix B, <br /> CEP Dwg. P3, <br /> - Final contours for each stage of phase development. CEP Dwg. P4 <br /> - Revised Site Life Estimate shows estimated year of phase Appendix C, Revised <br /> construction and years of operation, and the volume for Site Life Estimate <br /> each phase. <br /> III.A.3.d. Final Grading Plan 14 CCR 18222(h) Drawing P1 - Final Grading Plan shows final elevations of the Appendix B, <br /> completed disposal site. CEP Dwg. P4 <br /> III.A.4. Leachate Collection and 14 CCR 18222(k) Drawings P3 and P4 show leachate collection piping, leachate Appendix B, I <br /> Removal System collection swales, and collection sumps. Leachate Collection CEP Dwg. P3, <br /> system details are shown on Drawing P6. CEP Dwg. P4, <br /> CEP Dwg. P6 <br />