My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_2000-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 11:34:41 AM
Creation date
7/3/2020 11:06:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2011
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_2000-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III.A.3. Construction Sequencing <br /> Plans <br /> III.A.3.a. Excavation/Stockpiling 14 CCR 17680 The following drawings show the construction sequence of the Appendix B, <br /> Plans landfill: CEP Dwg. P2 <br /> P2: Excavation and Site Preparation Plan: <br /> - Borrow area (daily/intermediate, final cover). <br /> - Soil stockpiling area (most cell excavation will be used <br /> directly as daily cover and not stockpiled; additional <br /> excavation at construction will be stockpiled). <br /> - Base grades superimposed in pre-disposal topography. <br /> III.A.3.b. Base Preparation/Liner Drawings P3 and P4 show liner contours for each individual Appendix B, <br /> Placement Plans phase. CEP Dwg. P3, <br /> CEP Dwg. P4 <br /> III.A.3.c. Fill Sequencing Plans 14 CCR 18222(g) Drawings P3 and P4 show: Appendix B, <br /> CEP Dwg. P3, <br /> - Final contours for each stage of phase development. CEP Dwg. P4 <br /> - Revised Site Life Estimate shows estimated year of phase Appendix C, Revised <br /> construction and years of operation, and the volume for Site Life Estimate <br /> each phase. <br /> III.A.3.d. Final Grading Plan 14 CCR 18222(h) Drawing P1 - Final Grading Plan shows final elevations of the Appendix B, <br /> completed disposal site. CEP Dwg. P4 <br /> III.A.4. Leachate Collection and 14 CCR 18222(k) Drawings P3 and P4 show leachate collection piping, leachate Appendix B, I <br /> Removal System collection swales, and collection sumps. Leachate Collection CEP Dwg. P3, <br /> system details are shown on Drawing P6. CEP Dwg. P4, <br /> CEP Dwg. P6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.