Laserfiche WebLink
1.0 INTRODUCTION <br /> On behalf of Forward, Inc. (Forward), Geo 'c Associates (GLA)prepared this <br /> monitoring report for the French Camp Landfill, located on Manthey Road in San <br /> Joaquin County, California. This report was prepared in compliance with the <br /> requirements of the Central Valley Regional Water Quality Control Board(RWQCB) <br /> Monitoring and Reporting Program Order No. 5-2004-0159. This quarterly report <br /> presents the results of water quality monitoring and summarizes field activities completed <br /> at the French Camp Landfill from July 1 through September 30, 2006 (third quarter <br /> 2006). <br /> Monitoring Network <br /> The detection monitoring program(DMP)network at the French Camp Landfill currently <br /> includes six groundwater monitoring wells, four piezometers, two leachate monitoring <br /> wells, and three surface water monitoring stations. The locations of the DMP network <br /> stations are depicted in Figure 1 and summarized on the following table. <br /> Monitoring Point Monitoring Point I.D. <br /> DMP Groundwater Monitoring -6A,MW-7A <br /> Wells—Background <br /> DMP Groundwater Monitoring MW-8A,MW-9A,MW-9B,MW-10A <br /> Wells—Compliance <br /> Piezometers -3,MW4,MW-5,MW-7B <br /> Leachate Monitoring Wells MW-1A,MW-2 <br /> Surface Water Stations SW-1,SW-2,and SW-3 <br /> 2.0 STANDARD OBSERVATIONS <br /> During the third quarter 2006, the California Integrated Waste Management Board <br /> (CIWMB) conducted site inspections at the French Camp Landfill on July 12, August 23, <br /> and September 18, 2006. No notices of violation (NOV) were issued for the French <br /> Camp Landfill. Completed inspection forms are presented in Appendix A. <br /> Weekly site visits were conducted by French Camp Landfill personnel during the third <br /> quarter 2006. Records of the French Camp Landfill inspections are on file at the Allied <br /> Waste Forward Landfill Field Office, and weekly site visit summary reports for the third <br /> quarter 2006 are also presented in Appendix A. According to these weekly reports, the <br /> French Camp Landfill Operations Manager certifies that standard observations were <br /> conducted during the reporting quarter(see signed"Certification Statement"located <br /> inside cover page, after the Table Of Contents in this report). Inspection reports noted no <br /> areas of concern at the French Camp Landfill. Final closure construction work for the <br /> French Camp Landfill has been completed, and the final construction quality assurance <br /> (CQA)report will be submitted to the regulatory agencies by early to mid November <br /> 2006. In addition, groundwater monitoring wells -3 and MW-4 have been <br /> ® abandoned. <br /> W2003_021TC_nm06.doc <br /> 1 Geologic Associates <br />