My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
ARCHIVED REPORTS_2006_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 2:39:54 AM
Creation date
7/3/2020 11:06:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_3
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_2006_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CV= (n)(CD/2)2 (HW)(7.48) <br /> where: <br /> CV = casing volume(gallons) <br /> CD = casing diameter(feet) <br /> HW = height of water column within well (feet) <br /> 7.48 = conversion from cubic feet to gallons. <br /> • Each well with sufficient recharge was purged of a minimum of three casing volumes and 1 <br /> allowed to recover to 80 percent of the original well volume prior to sampling. Slow- <br /> recharge wells were purged of a minimum of one well volume and also allowed to recover <br /> sufficiently(for a period of no more than two hours)prior to sampling. <br /> • To assess the presence of fresh water coming into the well, dissolved oxygen(DO), electrical <br /> conductivity(EC),pH,turbidity, and temperature were monitored after approximately every <br /> two to five gallons of purging and were recorded on a Well Data Sheet. Sampling was <br /> performed when the total estimated purge volume was reached and the EC,pH,turbidity, and ' <br /> temperature stabilized to within 10%between consecutive readings. <br /> • Where a bailer was used for sample collection, a bottom-emptying device was inserted into <br /> the bailer, and the sample was transferred from the bailer to the container at a rate so as to <br /> minimize aeration. <br /> Groundwater Sampling Using Low-Flow Purging Methods <br /> • Groundwater monitoring wells that are equipped with dedicated sampling equipment were <br /> purged and sampled using low-flow purging methods. <br /> • With the weighted water-level meter in the well, the submersible pump was operated at a ' <br /> discharge rate that would minimize the decline in water level. <br /> • Discharged water was routed through a sampling chamber equipped with probes for ' <br /> measuring DO,EC,pH, turbidity, and temperature. When three consecutive readings of <br /> these field parameters had stabilized to within 10%of each other,with no discernible upward <br /> or downward trend,the water quality was determined to be stable and samples were <br /> collected. <br /> Groundwater Sampling Collection and Pre arp ation <br /> • Samples, including field, trip, and equipment blanks, were collected in approved sample <br /> containers (Table 1), and each container was filled completely and immediately capped, t <br /> labeled, and placed in a cooler with ice. Samples for VOC analysis were filled by pouring the <br /> sample down the side of the container to minimize aeration and capped with no airspace. ' <br /> 2 <br /> D.XFC SApbnsp06.doc <br /> Geologic Associates 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.