Laserfiche WebLink
Structure monitoring of the farm labor camp will continue on a <br /> quarterly basis. The next monitoring event is scheduled for <br /> April, 1994. <br /> ON SITE STRUCTURES <br /> The scale house was removed from the site in December, 1992 . The <br /> office/maintenance shed was monitored for methane on 2\4\94 The,, <br /> methane reading was approximately 30 ppm. Monitoring will <br /> continue on a quarterly basis. <br />