Laserfiche WebLink
STRUCTURE MONITORING <br /> In accordance with the letter from the San Joaquin County Public <br /> Health Services dated April 5, 1994 , structure monitoring at the <br /> Farm Labor Camp is being performed monthly from May - October. <br /> The results from this monitoring are being submitted separately. <br /> ON SITE STRUCTURES <br /> The scale house was removed from the site in December, 1992 . The <br /> office/maintenance shed was monitored for methane on 10/24/94 <br /> The methane reading was approximately 40 ppm. Monitoring will <br /> continue on a quarterly basis. <br /> R: \WES\EN\HL\GASMONRE.P13 <br /> LA 11458 <br />