Laserfiche WebLink
FARM LABOR P MONTHLY <br /> STRUCTURE MONITORING RESULTS <br /> OCTOBER 31, 1994 <br /> DATE: 10-31-94 <br /> TIME: 9: 00 a.m. <br /> Building Gas detected (Bldg) ppm Gas Comments <br /> No. ppm (vent) <br /> EAST 1/2 WEST 1/2 <br /> 1 260 140 110 <br /> 2 100 110 200 <br /> 3 20 60 100 <br /> 4 50 50 <br /> 5 80 90 <br /> 6 50 20 <br /> 7 20 60 <br /> 8 60 90 <br /> 9 50 80 <br /> 10 80 50 <br /> 11 40 20 <br /> 12 20 20 <br /> 13 20 20 <br /> 14 20 20 <br /> 15 20 20 <br /> Comments• <br /> The structures were vacant during this monitoring event. In <br /> accordance with previous monitoring results, levels dropped <br /> significantly compared to when the units are occupied. <br /> R: \WES\EN\HL\CAMP1094 <br />