My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1994-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 9:24:25 AM
Creation date
7/3/2020 11:08:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1998
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1990-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s Y' <br /> STATE OF CALIFORNIA Pei ;,,Gginernor <br /> CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD <br /> MW Cal Center Drive <br /> Sacramento,California 95826 <br /> 1 0 ' 6 <br /> Mr. Thomas Horton <br /> Solid Waste Manager <br /> San Joaquin County Publie Works <br /> P.O. Box 1810 <br /> Stockton, CA 95201 <br /> RE: Harney Lane Landfill Closure Construction, San Joaquin County, Facility 39-AA-0003 <br /> Dear Mr. Horton: <br /> California Integrated Waste Management Board (CIWMB) staff have reviewed the final cover <br /> as-built construction report and certification for the Harney Lane Landfill dated <br /> January 19, 1995. The report was submitted in accordance with Final Closure and Postclosure <br /> Maintenance Plans (Final Plans) which were approved on September 1, 1994. <br /> Based on CIWMB staff review of the report and field visits conducted during various stages <br /> of the construction, final cover construction is approved as having been completed in <br /> accordance with the approved Final Plans. The Central Valley Regional Water Quality <br /> Control Board has also approved the report by memo dated January 31, 1995 (Attached). <br /> CIWMB staff are appreciative of the County's diligent work in ensuring that final closure <br /> construction is being completed as required. Please continue to keep us informed as to the <br /> progress of construction of the landfill gas control system. <br /> If you have any questions please contact me at (916) 255-2343. <br /> Sincerely, <br /> colt Walker, Manager <br /> Closure and Remediation Branch North Section <br /> Permitting and Enforcement Division <br /> Attachment: Regional Water Quality Control Board Memo dated January 31, 1995. <br /> cc: Mr. Ed Padilla, San Joaquin County Solid Waste Local Enforcement Agency <br /> Mr. William Marshall, Central Valley Regional Water Quality Control Board <br /> Ms. Liz Haven, State Water Resources Control Board <br /> Printed on Recycled Paper-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.