Laserfiche WebLink
MONITORING AND REPORTING PROGRAM 9 <br /> FOR CLOSURE AND POST-CLOSURE MAINTENANCE OF <br /> HARNEY LANE CLASS III LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 4. Points of Compliance <br /> The points of compliance for ground water shall be Monitoring wells MW-2, MW-3 and <br /> MW-4. The point of compliance for surface water shall be monitoring point S-2. MW4 <br /> is not a compliance well for chloride concentration due to the possibility of interference <br /> from the sewage disposal ponds located directly upgradient. <br /> 5. Compliance Period <br /> The Compliance Period is the number of years equal to the active life of the waste <br /> management plus the closure period. Each time the Water Quality Protection Standard is <br /> exceeded(i.e., a release is discovered), the landfill begins a Compliance Period on the <br /> date the Board directs the Discharger to begin an Evaluation Monitoring Program. If the <br /> Discharger's Corrective Action Program (CAP)has not achieved compliance with the <br /> Standard by the scheduled end of the Compliance Period, the Compliance Period is <br /> automatically extended until the landfill has been in continuous compliance for at least <br /> three consecutive years. <br /> Statistical Procedures for Determining Significant Increases <br /> The significance of increases in indicator parameters and waste constituents over water quality <br /> protection standards shall be established through the use of the statistical procedures in §2555.7 <br /> of Chapter 15. <br /> The Discharger shall implement the above monitoring program on the effective date of this <br /> Order. <br /> Ordered by <br /> WILLIAM H. CROOKS, Executive Officer <br /> (Date) <br /> Attachments <br /> GAI:njs rev. 10 January 1996 <br />